My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ELIZABETH MOULE & STEFANOS POLYZOIDES ARCHITECTS AND URBANISTS - MOULE & POLYZIODES
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
E-F (INACTIVE)
>
ELIZABETH MOULE & STEFANOS POLYZOIDES ARCHITECTS AND URBANISTS - MOULE & POLYZIODES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2015 10:09:40 AM
Creation date
9/12/2007 10:06:43 AM
Metadata
Fields
Template:
Contracts
Company Name
ELIZABETH MOULE & STEFANOS POLYZOIDES ARCHITECTS AND URBANISTS - MOULE & POLYZIODES
Contract #
N-2007-101
Agency
PLANNING & BUILDING
Expiration Date
3/14/2008
Insurance Exp Date
6/30/2010
Destruction Year
2015
Notes
Amends A-2006-022, A-2006-136
Document Relationships
ELIZABETH MOULE & STEFANOS POLYZOIDES 1
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\E-F (INACTIVE)
ELIZABETH MOULE & STEPHANOS POLYZOIDES 1A
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\E-F (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />... <br /> <br />, <br /> <br />DANJON ENGINEERING, <br /> <br />Inc. <br /> <br />Professional Civil Engineering Services <br /> <br />March 2, 2001' <br /> <br />579-002 <br /> <br />Mr. Tony Perez <br />Elizabeth Moule & Stefanos Polyzoides Architects and Urbanists <br />180 E. California Blvd. <br />Pasadena, CA 91105 <br /> <br />Subject: <br /> <br />Santa Ana <br /> <br />Dear Tony: <br /> <br />Pursuant to our conversation yesterday, DANJON was requested to modify it work to incorporate <br />the city's deferred maintenance items into the sewer and water systems. DANJON envisions the <br />additional scope or work to be as follows: <br /> <br />1. Identify and verify that the existing sewer and water facilities that need to be replaced in <br />the next 20 yrs. <br /> <br />2. Provide the mark up sketches to M&P showing / indenting these utilities that need to be <br />replaced / upgraded. <br /> <br />3. Prepare a cost estimate to estimate these costs. <br /> <br />4. Attend two meetings as required with the City or M& P <br /> <br />DANJON estimates this to be 80 hours for $8,100 plus $ 1,000 ofreimbursables pursuant to the <br />terms and conditions of the original contract. <br /> <br />Please call me if you have any questions. <br /> <br />Sincerely, <br /> <br />Authorized by: <br />Moule & Polyzoides Architects and Urbanists <br /> <br />DANJON ENGINEERING, INe. <br /> <br />James D. Schreder, PE <br />Principal <br /> <br />Signed by: <br />Print Name: <br /> <br />EXHIBIT <br /> <br />83 <br /> <br />895 E. Yorba Linda Blvd., Ste.202, Placentia, CA 92870. Fax (714)572-6850. (714)572-6800.jims@danjonengineering.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.