My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2007-10-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
10/01/2007
>
FULL PACKET_2007-10-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:37:20 PM
Creation date
9/26/2007 2:08:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/1/2007
Destruction Year
2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FUNDING ANALYSIS <br />PROJECT NOS. 06-1009,06-1010,06-1011 AND 07-3205 <br />MAIN STREET REHABILITATION; WALKIE WAY TO NORTH CITY LIMITS, 8TH STREET <br />TO 18TH STREET; COLUMBINE TO SUNFLOWER; 8TH TO WASHINTION AND MAIN STREET <br />WATER MAIN FROM 8TH STREET TO WASHINGTION <br />Construction Contract $1,989,989 <br />Contract Administration 69,300 <br />Inspection and Testing 128,700 <br />Survey Staking 99,113 <br />Contingencies 198,998 <br />TOTAL ESTIMATED CONSTRUCTION COSTS $2,486,100 <br />EXHIBIT 2 <br />23A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.