My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2007-10-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
10/01/2007
>
FULL PACKET_2007-10-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:37:20 PM
Creation date
9/26/2007 2:08:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/1/2007
Destruction Year
2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />OCTOBER 1, 2007 <br />TITLE: <br />CONTRACT AWARD FOR FOURTH STREET <br />AND TUSTIN AVENUE REHABILITATION <br />(PROJECT NOS. 06-1717 AND 06-1019) <br />/ CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 15t Reading <br />^ Ordinance on 2nd Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract to R.J. Noble Company, the lowest responsible <br />bidder, in accordance with unit bid prices in the estimated amount <br />of $1,482,555 for construction of Fourth Street and Tustin Avenue. <br />2. Approve a Funding Analysis with a total estimated construction cost <br />of $1,853,400. <br />DISCUSSION <br />The segments of Fourth Street between the I-5 and SR-55 Freeways, and <br />Tustin Avenue between Seventeenth Street and North City Limits have been <br />identified as a high priority on the City's Pavement Management System <br />(Exhibit 1). The pavement is deteriorating due to weather, age and heavy <br />usage. Some of the adjacent curbs, gutters, sidewalks and driveway <br />approaches are also in various states of disrepair and require <br />replacement. This project provides for construction of new pavement, and <br />replacement of damaged concrete curbs, gutters, crossgutters, driveway <br />approaches and curb ramps. Once completed these improvements will <br />enhance the ride quality, surface drainage and visual appearance of the <br />streets. <br />The Notice Inviting Bids was advertised on August 24 and 27, 2007, and <br />bids were opened on September 19, 2007. A summary of the bid invitations <br />mailed, the bids received, and the bid results follow: <br />Santa Ana Contractors receiving notices: 13 <br />Contractors requesting bidding documents: 15 <br />Bids received: 5 <br />Bids received from Santa Ana Contractors: 1 <br />23B-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.