Laserfiche WebLink
Amendment Application No. 2007-02 <br />Tentative Tract Map No. 2007-04 <br />Site Plan Review No. 2007-02 <br />November 5, 2007 <br />Page 3 <br />1. The Alton Court project would not contribute any additional <br />traffic but would result in less traffic than currently generated <br />from the existing warehouse building. Traffic counts conducted <br />at the existing school district driveways indicates that the <br />existing facility generates approximately 700-800 daily trips, <br />which equates to approximately double the daily traffic <br />associated with the proposed Alton Court project. <br />2. The current street configuration is adequate to handle vehicular <br />traffic demand with the project; however, the existing school <br />operations impact the surrounding streets, especially at <br />intersections, on a short-term basis. <br />3. Vehicles exiting westbound from the project site will not be <br />impacted by existing and future traffic on Alton Avenue and will <br />have the ability to make a left turn movement. <br />4. The volume of traffic turning right from Fairview Street onto <br />Alton Avenue does not warrant a dedicated right turn lane at this <br />time. <br />5. A bus turnout is not feasible on Fairview Street due to traffic <br />and safety concerns raised by the Orange County Transportation <br />Authority (OCTA). <br />6. The relocation of the bus stop to the north side of Alton Avenue <br />is not feasible as it would result in a mid-block bus stop. <br />FISCAL IMPACT <br />There is no fiscal impact associated with this action. <br />l~~_ <br />Tay Trevino <br />cutive Director <br />Planning & Building Agency <br />VF:rb <br />vf/reports/aa07-02&ttm07-04.cc110507 <br />75A-3 <br />