My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 3321 SOUTH FAIRVIEW ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
11/05/2007
>
75A - PH 3321 SOUTH FAIRVIEW ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:36:56 PM
Creation date
10/31/2007 11:31:05 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
11/5/2007
Destruction Year
2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i~ <br />i~ <br />Chapter 3 <br />Environmental Checklist <br />For CEQA Compliance <br />PLANNING DIVISION <br />I. Project Title: Alton Court <br />II. Project Numbers: Amendment Application No. 2007-02/Specific Development No. 81/Tentative <br />Tract Map No. 2007-04 <br />III. Lead Agency Name and Address: City of Santa Ana, Planning and Building Agency <br />20 Civic Center Plaza, Ross Annex M-20 <br />P.O. Box 1988 <br />Santa Ana, CA 92702 <br />IV. Project Planner and Phone Number: Vince Fregoso (714) 667-2700 <br />V. Location: 3321 South Fairview Street, Santa Ana, CA. <br />VI. Environmental Determination. On the basis of this initial evaluation, I find that: <br />A. ^ The proposed project COULD NOT have a significant effect on the environment and a NEGATIVE <br />DECLARATION will be prepared. <br />B. ® Although the proposed project could have a significant effect on the environment, there will not be a significant <br />effect in this case because revisions to the project have been made by or agreed to by the applicant. A <br />MITIGATED NEGATIVE DECLARATION will be prepared. <br />C. ^ The proposed project MAY have a significant effect on the environment and an ENVIRONMENTAL IMPACT <br />REPORT is required. <br />D. ^ Although the proposed project could have a significant effect on the environment, because all potentially <br />significant effects (a) have been analyzed adequately in an earlier EIR (EIR No. -)pursuant to applicable <br />standards and (b) have been avoided or mitigated pursuant to that earlier EIR, including revisions or mitigation <br />measures that are imposed upon the project, nothing further is required. <br />E. ^ Pursuant to Section 15164 of the CEQA Guidelines, an EIR (EIR No. -)has been prepared earlier and only <br />minor technical changes or additions are necessary to make the previous EIR adequate and these changes do <br />not raise important new issues about the significant effects on the environment. An ADDENDUM to the EIR <br />shall be prepared. <br />F. ^ Pursuant to Section 15162 of the CEQA Guidelines, an EIR (EIR No. -)has been prepared earlier; however, <br />subsequent proposed changes in the project and/or new information of substantial importance will cause one <br />or more significant effects no previously discussed. A SUBSEQUENT EIR shall be prepared. <br />.~. <br />S ~' 07 <br />Signature Date <br />Printed Name <br />Alton Court <br />Initial Study/Mitigated Negative Declaration <br />3-1 <br />August 2007 <br />J8S 00635.07 <br />75A-67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.