Laserfiche WebLink
<br />I <br /> <br />AL TERNET NETWORKS PROPIDET ARY <br /> <br />and such change order shall only become effective upon written agreement by an authorized <br />representative of each of the parties. <br /> <br />5. SYSTEM ENGINEERING <br /> <br />5.1 Svstem Desim <br />The Consultant shall provide documentation, including specifications, for the hardware, software <br />and/or other products required for the Next Generation Surveillance System. Each major <br />revision of the deliverable documentation shall be provided to SAPD. SAPD may provide <br />written comments on the specifications that must be addressed by the Consultant. <br />The Consultant shall be willing to hold discussions with SAPD and any other third party vendors <br />that SAPD sees fit. <br /> <br />5.2 Interface Defmition <br />lCD's and functional specifications shall fully define all aspects of the interfaces between the <br />Next Generation Surveillance System and other systems, including all electrical, physical, signal, <br />protocol, logical, timing and other characteristics needed by SAPD not mentioned herein. The <br />lCD's and functional specifications which include Next Generation Surveillance System <br />interfaces are indicated in Table 1. Interface Control Documents and Functional Specifications. <br />The Next Generation Surveillance System will be integrated to any and all interfacing equipment <br />at any SAPD facility and SAPD deemed facility. The Consultant shall provide technical <br />documentation on integration hardware, software, usage, testing, planning, design, engineering, <br />operation and any other required functional uses that SAPD deemed facilities will require the <br />RFPs phases. This support shall be provided through final acceptance. It shall include <br />integration support to identifY and resolve interface incompatibilities between interfacing <br />subsystems. The Consultant shall work cooperatively with those responsible for interfacing <br />subsystems and recommend to SAPD the optimum system solution (irrespective of which <br />subsystem is at "fault") for correcting the deficiency. <br /> <br />Table 1. Interface Control Documents and Functional Specifications <br /> <br />Interface Control Document Doc Responsible Doc Number <br />Hardware definition Alternet Networks <br />Software definition Alternet Networks <br /> <br />5.3 Desim Entrineerine. SUDDort for Facility <br /> <br />5.3.1 Operational Areas <br />The Consultant shall support and or lead all SAPD facility engineering meetings. These <br />meetings shall define the architectural, mechanical, electrical and aesthetic design and <br />engineering for the integration of the Next Generation Surveillance System. <br />The Consultant shall support and assist SAPD for all Next Generation Surveillance System <br />working and operational spaces which shall be analyzed and reviewed to establish design and <br />engineering criteria. <br /> <br />15 <br />