Laserfiche WebLink
<br />ALTERNET NETWORKS PROPRIETARY <br /> <br />5.3.2 Facility Architectural Requirements <br />As SAPD releases preliminary architectural plans, the Consultant shall review and comment on <br />these plans from the perspective of room layout and dimensional requirements. <br /> <br />5.3.3 Power, Grounding and HV AC <br />The Consultant will participate in the design, engineering, specification and testing of the facility <br />power and heat design. Consultant or SAPD shall obtain a qualified contractor that will provide <br />required power and heat loads on a rack-by-rack and subsystem-by-subsystem basis deemed by <br />Consultant. <br />All special power (voltage, phase or current other than 120V, single phase, 20 Amps) and normal <br />requirements, (voltage, phase or current that is 120V, single phase, 20 Amps) shall be delivered <br />to SAPD in writing at Critical Design Reviews. <br /> <br />6. TECHNICAL REVIEWS <br /> <br />The Consultant shall conduct the technical reviews listed below over the course of the contract. <br />The schedule for the contract begins with the Effective Date of Contract ("EDC"). The EDC <br />shall be the date agreed upon by SAPD and Consultant, and does not require a completed <br />contract. Design plans, performance analysis, project summaries, drawings, and other <br />documentation required to evaluate the overall status and interoperability of the Next Generation <br />Surveillance System performance shall be incorporated into the review package for presentation <br />to SAPD. <br /> <br />As a minimum, the following Technical Reviews shall be conducted: <br /> <br />. Critical Design Review (CDR) TBD <br /> <br />· Ad Hoc Design Reviews as needed <br /> <br />· Interface Control Working Groups as needed <br /> <br />. Substantial Completion Review TBD <br /> <br />. Final Acceptance Review TBD <br />The Consultant shall provide written minutes and action items of all Technical Reviews, <br />including ICWG's and ad hoc reviews, within five (5) working days of each review. All action <br />items shall be tracked by the PMO to closure. <br />The Consultant's performance, including the witnessing of all formal testing, shall be subject to <br />witness by SAPD. In the event of a specific request in writing by SAPD, the Consultant shall <br />provide the SAPD duly authorized representative complete access to all documentation relating <br />to the Next Generation Security System integration design, engineering, planning, testing and <br />RFPs phases. <br /> <br />6.1 Critical Desio Review <br />The Critical Design Review (CDR) shall be conducted at SAPD's facility. The CDR shall <br />present the Next Generation Surveillance System design at the detailed design level. The purpose <br />of the CDR is to document the full compliance of the Next Generation Surveillance System <br />design (by test or analysis) to the requirements of SAPD specification prior to the Next <br />Generation Surveillance System RFPs and installation phases. The Consultant shall present its <br /> <br />16 <br />