Laserfiche WebLink
<br />AL TERNET NETWORKS PROPRIETARY <br /> <br />reliable functionality as part of this interface development activity. These meetings will be <br />organized by either SAPD or Consultant. <br /> <br />6.4 Substantial ComDletion <br />The Consultant shall conduct the Substantial Completion review that addresses the milestone <br />requirements listed in this section. <br /> <br />· Consultant shall design, engineer, specify, develop and test equipment as required in the <br />Statement of Work agreement. <br /> <br />· Consultant shall have completed delivery of all documentation required by this Statement <br />of Work. <br /> <br />· Completion of SAPD and SAPD deemed facility architectural, electrical and aesthetic <br />design and engineering site acceptance. <br /> <br />6.5 Final AcceDtance <br />The Consultant will conduct the Final Acceptance Review that addresses completion of the <br />contract. Successful completion of Final Acceptance requires the following. <br /> <br />· Completion of all Next Generation Surveillance System features as defined in Next <br />Generation Surveillance System Specification. <br /> <br />. Mutually agreeable RFPs for submittal. <br /> <br />· RFPs that have been submitted, product received and closed. <br />SAPD will have a period of 30 days from Final Acceptance Review to demonstrate any non- <br />compliance of the SAPD Next Generation Surveillance System Requirement Specification. A <br />"Punch List" will be established, which shall be a list of all SystemlProduct non-conformances <br />with the Specifications. Each issue on the Punch List shall be categorized by mutual agreement <br />according to the following categorizations: <br />Level 1 - Nonconformities to the Specification which either prevents the System being <br />put into operation or which would significantly impact the day to day operation of the <br />System. <br />Level 2 - Nonconformities to the Specification which require rectification but which <br />would not prevent the System being put into operation nor impact the day to day <br />operation of the System. <br />Level 3 - Issues which do not amount to a nonconformity to the specification but which <br />the Consultant had agreed to (acting reasonably) to address e.g. a ''wish list". <br />Consultant agrees to in good faith to resolve all the items on the Punch List. If no material non- <br />conformances are identified or all Level 1 and Level 2 non-conformances have been resolved, <br />and Consultant has provided all remaining Deliverables required under the Statement of Work, <br />the Next Generation Surveillance System shall be deemed to have successfully passed "Final <br />Acceptance" and SAPD shall so certify to Consultant. SAPD shall not unreasonably withhold <br />such certification. Usage of the Next Generation Surveillance System and or Specifications by <br />SAPD prior to such certification shall not imply that Final Acceptance has been granted. <br /> <br />18 <br />