My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE 7
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY PRIOR TO 2017
>
PLANNING CENTER, THE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 4:22:56 PM
Creation date
12/20/2007 5:15:46 PM
Metadata
Fields
Template:
Contracts
Company Name
PLANNING CENTER, THE
Contract #
A-2007-287
Agency
Planning & Building
Council Approval Date
8/6/2007
Expiration Date
3/31/2009
Insurance Exp Date
7/1/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.3 Preparation of Public Review <br />Following receipt of comments from the HCE <br />compliance, The Planning Center will produc <br />the Housing Element for consideration by the <br />Commission. At this point, comments from tl <br />process will also be received from the public <br />necessitating slight adjustments in the Housinb <br />Following receipt of comments from the Planning Commission and City <br />Council at the public hearings, The Planning Center will prepare a final <br />draft of the Housing Element suitable for public records. The final draft <br />will include comments received during the public hearing, both on the <br />Housing Element and environmental clearance, as directed by City staff. <br />Upon completion, critical project files (including an editable copy of the <br />Element and a PDF copy) will be provided to the City on CD. <br />Deliverables <br />• Draft Housing Element (7S copies) <br />• Final Housing Element (100 copies) <br />• Final Housing Element (unbound, camera ready) <br />• Editable final copy in Word and PDF copy <br />Task 4: Environmental Review <br />4A Initial Study/ND <br />Based on the available strategies proposed above to meet housing <br />reQuirements, it appears that the City can achieve their assigned RHNA <br />allocation without amending the land use plan of the General Plan. <br />Major land use or infrastructure improvements are not to be reQuired. <br />Based on this preliminary conclusion, it appears that environmental <br />impacts related to the Housing Element are not significant. <br />Our proposed scope of work, therefore, is based on the assumption that <br />an Initial Study will be prepared that supports a Negative Declaration <br />(ND) under the California Environmental Quality Act (CEQA) If a more <br />aggressive Housing Element is necessary to achieve the City's RHNA <br />allocation, preparation of a Mitigated Negative Declaration (MND) may <br />be reQuired. If this becomes necessary, a revised scope of work and <br />contract amendment will be submitted to the City. <br />Although each potential environmental impact as identified in the CEQA <br />Appendix G checklist will be addressed in the Initial Study, the analysis <br />will focus on air Quality, land use, noise, and population and housing. <br />Housing Element Update THE PLANNING CENTER I Page 2-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.