My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PARSONS, BRINCKERHOFF (PB) 2C-2007
Clerk
>
Contracts / Agreements
>
P
>
PARSONS, BRINCKERHOFF (PB) 2C-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 9:52:13 AM
Creation date
12/21/2007 4:58:32 PM
Metadata
Fields
Template:
Contracts
Company Name
PARSONS, BRINCKERHOFF (PB)
Contract #
A-2007-283
Agency
PUBLIC WORKS
Council Approval Date
12/3/2007
Expiration Date
3/31/2009
Insurance Exp Date
11/1/2008
Destruction Year
2013
Notes
A-2007-035
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables: <br />• Regular Progress Reports and Invoices <br />• Attendance at monthly Progress Meetings <br />Task 2. Data Collection <br />2.1 PB will incorporate the Data List and data analyses conducted to date into this <br />amendment. <br />2.2 PB will research, compile and present general operating, cost and performance <br />data for Modern Streetcars and ground power supply rail systems, including an <br />identification and discussion of Streetcar and ground power supply rail systems <br />currently in operation, as possible applications for the Civic Center Fixed <br />Guideway Project Concept. <br />2.3 PB will document street and public rights-of-way to assess the opportunities and <br />constraints related to implementing various transit technologies within the City of <br />Santa Ana. <br />2.4 PB will collect, review and evaluate other data and background materials <br />necessary to successfully develop the Transit Vision and Go Local Project <br />Concepts Definition. <br />Deliverables: <br />• Updated Data List to include data sources on Streetcars and ground power <br />supply rail systems, street and public right-of-way information, and other new <br />data sources gathered to complete this work scope. <br />Task 3. Background Analysis <br />3.1 PB will summarize and use the results from the draft Travel Patterns and <br />Demand Analysis Technical Memorandum to support the Transit Vision and Go <br />Local Project Concept Definition. <br />3.2 PB will summarize the Alternatives Analysis work completed to date, which <br />included an initial assessment of possible transit connections between the Santa <br />Ana Regional Transportation Center and the Civic Center/Downtown, Main <br />Place/City Place, South Coast Metro/MacArthur Place, Metro East, and along the <br />Pacific Electric (PE) Right-of-Way, to support the Transit Vision and Go Local <br />Project Concept Definition by documenting the advantages of the selected <br />project concept. <br />3.3 PB will prepare a Background Chapter for the Final Study Report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.