My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PARSONS, BRINCKERHOFF (PB) 2C-2007
Clerk
>
Contracts / Agreements
>
P
>
PARSONS, BRINCKERHOFF (PB) 2C-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 9:52:13 AM
Creation date
12/21/2007 4:58:32 PM
Metadata
Fields
Template:
Contracts
Company Name
PARSONS, BRINCKERHOFF (PB)
Contract #
A-2007-283
Agency
PUBLIC WORKS
Council Approval Date
12/3/2007
Expiration Date
3/31/2009
Insurance Exp Date
11/1/2008
Destruction Year
2013
Notes
A-2007-035
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables: <br />• Background Chapter 2 in Final Study Report <br />Task 4. Transit Vision <br />4.1 PB will refine and complete a Transit Vision for the City of Santa Ana and <br />prepare a Transit Vision Chapter for the Final Study Report. The Transit Vision <br />will: <br />• Incorporate regional long-term and local short-term transit project concepts, <br />specifically: <br />o a fixed guideway/streetcar transit system between the SARTC and the <br />Civic Center with an extension option onto the PE Right-of-Way and <br />identification of possible future extensions to Main Place/City Place <br />and the Metro East area <br />o along term concept for use of the PE Right-of-Way <br />o expansion of the SARTC to accommodate the short term project <br />concept and the long term vision. <br />• Relate directly to regional and local transit and land use plans, specifically <br />the: <br />o OCTA Metrolink Expansion Plan <br />o OCTA BRT Plan <br />o HOV, High Speed Rail and maglev plans <br />o Santa Ana General Plan <br />o Santa Ana Renaissance Specific Plan <br />o Santa Ana Metro East Overlay Zone <br />• Identify the Go Local components of the vision for short range planning and <br />further definition of the Go Local Concept. <br />4.2 PB will prepare up to three (3) maps and graphics, and one (1) Power Point <br />presentation to support the Transit Vision. <br />Deliverables: <br />• Transit Vision Chapter 3 in Final Study Report <br />• Up to three (3) maps and graphics <br />• One (1) Power Point presentation <br />Task 5. Go Local Project Concept Definition <br />5.1 PB will define the concept for a fixed guideway/streetcar transit system <br />connecting the SARTC with the Civic Center/PE Right-of-Way. The concept <br />definition will include: <br />• Routing options <br />
The URL can be used to link to this page
Your browser does not support the video tag.