My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - TESTING AND INSPECTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
01/07/2008
>
25K - TESTING AND INSPECTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:34:52 PM
Creation date
1/1/2008 11:38:21 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25K
Date
1/7/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
select or exercise authority over the testing laboratory. <br />• Accepting testers from the selected firm shall carry adequate identification with <br />them so that the Independent Assurance testing personnel can verify the <br />acceptance testers' certificates. <br />• The selected firm must maintain the laboratory testing equipment in <br />accordance with recognized national standards. <br />• The selected firm must have an independent assurance testing and sampling <br />program. This program can be performed either by their own personnel not <br />involved in the acceptance testing and sampling, or by another quality <br />assurance organizatiori. <br />Acceptance Testing and Sampling <br />• The selected testing laboratory shall conduct acceptance sampling and testing <br />of materials and work on the first day such work is performed; and continues <br />daily until the work is completed. <br />Reporting Test Results <br />• When aggregate is sampled in the material source, the laboratory firm shall <br />submit to the Resident Engineer results of sand equivalent, cleanness value <br />and sieve analysis within 24 hours. When soils and aggregate are sampled at <br />the job site, results of these tests should be submitted within 72 hours. <br />:: _ ..____ _ _ __ • __ Results _.of___compaction___and_ _density._ tests" _taken..at_ he job__ site_ should _ be _ _ <br />• submitted within 24 hours. <br />~ When soils and asphalt concrete are sampled at the job site, R-value and <br />asphalt extraction should be submitted within 96 hours. <br />Independent Assurance Sampling and Testing <br />The selected firm shall provide an Independent Sampling and Testing (ISAT) <br />program: <br />• To verify that the project's sampling and testing of materials is performed <br />correctly by the testers and samplers. <br />• To ensure the equipment is properly calibrated. <br />• To provide the City with a copy of the program so that the Resident Engineer <br />may verify that the program is carried out. <br />• To provide the Resident Engineer with an immediate report, including action to <br />- 5 - <br />25K-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.