My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 2100 W ALTON
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
01/07/2008
>
31A - 2100 W ALTON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:34:56 PM
Creation date
1/1/2008 11:38:26 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
1/7/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• grading of 1,309,000 square feet of area. Assuming grading of <br />the entire project site, approximately 108,900 square feet of <br />area would be graded. The proposed grading would be considerably <br />less than the threshold of significance established by the CEQA <br />Air Quality Handbook. Additionally, the project would be subject <br />South Coast Air Quality Management District Fugitive Dust Rule <br />403 to minimize fugitive dust impacts. <br />To insure the project complies with Fugitive Dust Rule 403, the <br />following mitigation measures shall be implemented. <br />Mitigation Measure <br />Grading plans for the proposed project shall reflect the <br />following notes: <br />• All material excavated or graded will be sufficiently watered <br />to prevent excessive amounts of dust. Watering with complete <br />coverage shall occur at least twice daily, once in the late <br />morning and once after work is done for the day. <br />• All clearing and earthwork activities shall cease during <br />. period of high winds (winds greater than 25 mph averaged over <br />one hour) or during Stage 1 or Stage 2 smog episodes. <br />• Streets surrounding the project site should be cleaned at the <br />end of each day of construction. <br />• All material transported offsite shall either be sufficiently: <br />.watered or securely covered to prevent excessive amounts of <br />dust. <br />• The amount of area disturbed by clearing and earthwork <br />activities shall be minimized at all times. <br />• Equipment engines shall be maintained in good condition and <br />in proper tune according to manufacturer's specifications. <br />• To the extent feasible, gasoline powered equipment shall be <br />used for onsite and. offsite construction activities. <br />C. Result in a cumulatively considerable net increase of any <br />criteria pollutant for which the project region is non- <br />• attainment under an applicable federal or state ambient air <br />quality standard? <br />3 fi~=~` J <br />
The URL can be used to link to this page
Your browser does not support the video tag.