My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 2100 W ALTON
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
01/07/2008
>
31A - 2100 W ALTON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:34:56 PM
Creation date
1/1/2008 11:38:26 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
1/7/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• As part of the City's development review process, emergency <br />access was evaluated by the Santa Ana Fire Department. The Fire <br />Department determined that the proposed project did not provide <br />any constraints for adequate emergency access. <br />F. Result in inadequate parking capacity <br />Less Than Significant Impact <br />A total of 203 parking stalls <br />However, a total of 116 would <br />standard, a minor exception w. <br />project to share parking with <br />the east. <br />G. Conflict with adopted <br />transportation <br />are required for the project. <br />be provided. To meet the parking <br />Auld be required to allow the <br />the future Catholic Cathedral to <br />policies supporting alternative <br />Less Than Significant Impact <br />The Orange County Transportation Authority operates a fixed <br />• route bus service when the project area. Metrolink and Amtrak <br />Train Service would also be .available through bus service to the <br />Santa Ana Regional Transportation Center. The proposed project <br />would not be in conflict with any City policies regarding <br />alternative modes of transportation. Nor would implementation of <br />the proposed project displace any existing modes of public <br />transportation provided within the project area. <br />XVI. UTILITIES and SERVICE SYSTEMS <br />D. Are sufficient water supplies available to serve the <br />project from existing entitlements and resources or are new <br />or expanded entitlements needed? <br />Potentially Significant Unless Mitigation Incorporated <br />The City of Santa Ana Water Department would provide domestic <br />water service for the proposed project. The City of Santa Ana <br />produces water from two sources. The Orange County Groundwater <br />Basin provides 66% of the annual water supply and the <br />Metropolitan Water District provides 34% of the annual water <br />supply. The City of Santa Ana has 19 active wells with combined <br />• capacities of approximately 42,500 gallons per minute. The City <br />also has seven MWD connections with combined normal operating <br />capacities of 20,700 gallons per minute. The total combined <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.