Laserfiche WebLink
• <br />• <br /> <br />t i <br />" '~ Environmental Checklist <br />~, <br />For CEQA Compliance <br />Issues & Supporting Information Sources <br />D. Disturb any human remains, including those <br />interred outside of formal cemeteries? <br />Vl. Geology and Soils -Would the project: <br />A. Expose people or structures to potential substantial <br />adverse effects, including the risk of loss, injury, or <br />death involving: <br />1. Rupture of an known earthquake fault, as <br />delineated on the most recent on the most <br />recent Alquist-Priolo Earthquake Fault Zoning <br />map issued by the State Geologist for the area <br />or based on other substantial evidence of a <br />known fault? <br />2. Strong seismic ground shaking? <br />3. Seismic-related ground failure, including <br />liquefaction? <br />4. Landslides? <br />B. Would the project result in substantial soil erosion <br />or the loss of topsoil? <br />C. Would the project result in the loss of a unique <br />geologic feature? <br />D. Is the project located on strata or soil that is <br />unstable or that would become unstable as a result <br />of the project and potentially result in on-or off-site <br />landslide, lateral spreading, subsidence, <br />liquefaction or collapse? <br />E. Where sewers are not available for the disposal of <br />wastewater, is the soil capable of supporting the <br />use of septic tanks or alternative wastewater <br />disposal systems? <br />mdlmswordlenvcheck.doc\1.15.99 <br />Page 39 of 45 <br />31 A-50 <br /> Potentially <br /> Significant <br />Potentially Unless Less Than <br />Significant Mitigation Significant No <br />Impact Incorporated Impact Impact <br /> ^ ^ <br />^ ^ ^ o <br />^ ^ o ~' <br />^ ^ ~( ^ <br />^ ^ ,~ ^ <br />^ ^ ^ <br />^ ~' o ,~' <br />^ <br />° ° ° <br />^ ~ ^ ^ <br />^ ^ ^ ~f <br />Page 4 of 10 <br />