Laserfiche WebLink
<br />l 1 <br />" '; Environmental Checklist <br />For CEQA Compliance <br /> Potentially <br /> Significant <br /> Potentially Unless Less Than <br /> <br />Issues & Supporting Information Sources Significant Mitigation Significant No <br />Impact Incorporated Impact Impact <br />VII. Hazardous and Hazardous Materials -Would the project: <br />A. Create a significant hazard to the public or the ^ ^ (~ ^ <br />`" <br />environment through the routine transport, use or ~ <br />'C <br />disposal of hazardous materials? <br />B. Emit hazardous emissions or handle hazardous or ^ ^ ~ ^ <br />acutely hazardous materials, substance or waste <br />within one-quarter "mile of an existing or proposed <br />school? <br />C. Be located on a site which is located on a list of ^ ^ ^ <br />hazardous materials sites compiled pursuant to <br />Government Code Section 659662.5 and, as a <br />. <br />result, would it create a significant hazard to the <br />public or the environment? <br />D. For a project located within an airport land use plan ^ ^ ~ ^ <br />or where such a plan has not been adopted, within <br />two miles where of a public airport or public use <br />airport, would the project result in a safety hazard <br />for people residing or working in the project area? <br />VIII. Hydrology and Water Quality -Would the project: <br />A. Violate Regional Water Quality Control Board water ^ [~ ^ ^ <br />quality standards or waste discharge jT <br />requirements? <br />B. Substantially deplete groundwater supplies or ^ ^ ^ <br />interfere substantially with groundwater recharge <br />such that there would be a net deficit in aquifer <br />volume or a lowering of the local groundwater table <br />level (i.e., the production rate of pre-existing nearby <br />wells would drop to a level which would not support <br />existing land uses or planned uses for which <br />permits have been granted)? <br />• <br />mdlmswordlenvcheck.doc11.15.99 <br />3P~i~°=~51 <br />Page 5 of 10 <br />