My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - ENGINEERING SVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
02/04/2008
>
25K - ENGINEERING SVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:33:56 PM
Creation date
1/30/2008 10:54:05 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25K
Date
2/4/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THIRD AMENDMENT TO <br />CONSULTANT AGREEMENT <br />THIS THIRD AMENDMENT TO CONSULTANT AGREEMENT is entered <br />into on February 4, 2008, by and between METCALF & EDDY, a Delaware corporation <br />("Consultant") and the City of Santa Ana, a charter city and municipal corporation of the <br />State of California ("City"). <br />Recitals: <br />A. The parties entered into Agreement A-2005-077, dated April 4, 2005, (hereinafter <br />"said Agreement") by which Consultant has provided engineering services, including <br />preparing plans, specifications and construction inspection services. <br />B. In accordance with the terms and conditions of said Agreement, the parties wish to <br />amend the Scope of Services and Compensation to provide for additional services in <br />relation to the West Pump Station Upgrade. <br />Wherefore, in consideration of the covenants contained in said Agreement, and subject <br />to all the terms and conditions of said Agreement, except those amended in this Second <br />Amendment to Consultant Agreement, the parties agree as follows: <br />1. Section 1, SCOPE OF SERVICES, shall be amended to provide that Consultant will <br />perform additional engineering services to address the City's Plan Check Review for <br />the West Pump Station Upgrade Project as follows: <br />Task 1 -Electrical and Instrumentation Related Work. <br />A. Consultant takes the following Exceptions to the Plan Check Review <br />comments: <br />1. Consultant will not accommodate City's request for added above- <br />grade pullboxes for ductbanks feeding well pumps. <br />2. Consultant will not modify the size or layout of the electrical room. <br />3. Consultant will not change its approach to showing wiring for <br />Chlorine Building. <br />B. Scope of Work <br />1. Change communications protocol design form Modbus to Devicenet <br />2. Implement the use of Unitronics V570 PLC <br />3. Relocate the transformer pad to a farther west location. The approval <br />of this relocation will be subject to SCE recommendations. <br />4. Relocated electrical panel to allow addition of a new door and door <br />switch. <br />5. Add a groundfault for incoming feeder <br />6. Address and incorporate all other review comments with plans and <br />specifications. <br />25K-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.