Laserfiche WebLink
Task 2 -Structural and Architectural Related Work. There will be no exceptions <br />taken for this portion of the work. The Scope of Work includes: <br />1. Provide a new architectural floor plan. <br />2. Provide a new architectural roof plan. <br />3. Provide a Building sections in two directions. <br />4. Revise plans to show relocation and changes to the doors as MCC/ <br />pump room. <br />5. Reanalysis of the roof diaphragm. <br />6. Addition of firestops to the mansard roof framing. <br />Task 3 -Soil Engineering Certificate Work. The Scope of Work includes: <br />1. Review foundation plans and notes to ensure compliance with <br />project's geotechnical reports recommendations are incorporated in the <br />design and construction. <br />2. Sign foundation drawings. <br />3. Provide a letter as Geotechnical Engineer of Record to document <br />Consultant's review. <br />Consultant may, on the written request of the Executive Director of Public Works, <br />provide additional services related to the West Pump Station Upgrade Project. <br />Section 3.a., COMPENSATION, shall be amended to increase total compensation by <br />$10,500 for the Electrical and Instrumentation related work; $11,000 for Structural <br />and Architectural related work; and $3,000 for the Soil Engineering Certification <br />work set forth above. Additional services may be compensated in a maximum <br />amount of $6,000.00. The total amount expended pursuant to said Agreement shall <br />not exceed $229,813.00. <br />3. Except as herein amended, all terms and conditions of said Agreement shall remain in <br />full force and effect. <br />IN WITNESS WHEREOF, the parties hereto have executed this Third Amendment to <br />Consultant Agreement on the date and year first written above. <br />ATTEST: <br />CITY OF SANTA ANA <br />PATRICIA E. HEALY <br />Clerk of the Council <br />DAVID N. REAM <br />City Manager <br />25K-5 <br />