Laserfiche WebLink
Mr. Michael F. Harrah <br /> Caribou Industries, Inc. <br /> September 9, 2020 <br /> Page 15 <br /> Table 2 provides a summary of the Project's residential parking supply ratio with implementation of the <br /> above-recommended PMP measures.A review of RowA of Table 2 shows that the Project's parking ratio <br /> calculates to 1.15 spaces/unit (196 spaces= 171 units). <br /> With implementation of PMP measure No. 3, which would be attained by providing valet parking for the <br /> entire parking structure (122 spaces), the Project's parking supply ratio would increase to 1.86 <br /> spaces/unit (318 spaces 196 units)as shown on Row B of Table 2. <br /> With implement of PMP measure No. 4 (in addition to PMP No. 3) which would be attained by leasing <br /> up to 50 off-site parking spaces within the City-owned parking structure, the Project's parking supply <br /> ratio would increase to 2.15 spaces/unit (368 spaces W 196 units) as shown on Row C of Table 2. <br /> CONCLUSIONS <br /> This analysis demonstrates that the Project is providing adequate parking supply (a total of 279 spaces <br /> for the Residential and Hotel Use).The inclusion of 196 parking spots for the Residential use satisfies the <br /> requirements of the California Government Code Section 65915 (p)(1) and the inclusion of 83 parking <br /> spaces satisfies the requirements of section 41-1344 of the City of Santa Ana Municipal Code (SAMC). <br /> While such an action is not required,applicable PMPs have been identified which would allow the Project <br /> to attain the 2.15 blended parking ratio required by the Santa Ana Transit Zoning Code,if it were applied. <br /> These findings are consistent with the less than significant findings in the TZC EIR(Long-term cumulative <br /> development under the implementation of this Transit Zoning Code would not result in inadequate <br /> parking capacity). If you have any questions, please contact me at (949) 660-1994. <br /> Respectfully submitted, <br /> URBAN CROSSROADS, INC. <br /> Haseeb Qureshi <br /> Associate Principal <br /> 12193.11 Parking Study OURBAN <br /> CROSSROADS <br />