Laserfiche WebLink
Mr, Michael F. Harrah <br /> Caribou Industries, Inc. <br /> September 9, 2020 <br /> Page 16 <br /> TABLE 2: PROJECT PARKING SUMMARY—PARKING SUPPLY RATIOS <br /> Use Quantity <br /> Parting Required. <br /> Rate' Parking spaces. <br /> 95 Studio Units x 1 space 95 <br /> Residential 171 units 51 One-Bedroom Units x 1 space 51 <br /> 25 Two-bedroom Units x 2 spaces 50 <br /> Parking Requirement 196 <br /> Proposed On-site Parking Supply 196 <br /> A Composite Parking supply Ratio 1.15 <br /> Proposed On-site Parking Supply+PMP Measure 3 318 <br /> B Composite Parl�ing supply Ratio[sp/du}' <br /> Proposed On-site Parking Supply+PMP Measure 3+PMP Measure 4 368 <br /> C Composite Parking supply;Ratio[sp/dP) 2 15 <br /> 12193-11 Parking Study OURBAN <br />