Laserfiche WebLink
Section I: Introduction (continued) <br />CUDAHY REDEVELOPMENT PLAN AMENDMENTS <br />ENVIRONMENTAL, IMPACT REPORT <br />David Evans and Associates, Inc. is currently preparing an environmental impact report for <br />amendments to the Cudahy Redevelopment Plan. The City of Cudahy is located west of <br />the Los Angeles River and the Long Beach Freeway and approximately 8 miles southeast <br />of downtown Los Angeles. The Cudahy Redevelopment Plan was established in July 1977 <br />and covers approximately 330 acres of the City. The project consists of a Second and a <br />Third Amendment to the Cudahy Redevelopment Plan. <br />The proposed Second Amendment will increase the time limitation for incurring debt; <br />lengthen the term of the Redevelopment Plan; allow eminent domain powers to continue; <br />limit the density of development in the project area to that specified in the land use plan <br />and zoning map; and require existing and proposed land uses to comply with provisions of <br />the General Plan and Zoning Ordinance. These actions will not result in direct physical <br />development, but will allow the Agency to continue redevelopment efforts in the City. <br />The Third Amendment will extend the project area boundaries to include 7 additional lots <br />along Live Oak Street. The additional area covers approximately 95,550 square feet and <br />is developed with single family detached units and a multi -family residential building. The <br />area is zoned Medium -Multiple Residential (R-3) and may change to the Commercial - <br />Manufacturing (C-M) Zone. This amendment will result in the development of a <br />commercial structure on the site. <br />Upon completion, the EIR will serve. as a public information document which will provide <br />an analysis of the physical and environmental . impacts that may occur with the <br />implementation of the proposed project area boundary change and a discussion of the <br />indirect impacts of the increase in the time limitation to incur debt, lengthen the duration <br />of the plan, and allow eminent domain powers to continue. <br />The EIR for the Cudahy Redevelopment Plan Amendments is a program EIR. The <br />program EIR provides for a more general view of the impacts associated with all the <br />individual projects and discusses impacts which may be individually insignificant but <br />cumulative adverse. As a program EIR, it allows the development of area -wide mitigation <br />measures to address the collective impacts of the redevelopment plan. <br />Marc Blodgett and Josephine Tan Aiido are working on the EIR. The NOP has been <br />circulated and the EIR is currently under preparation. The project has a $21,000 budget. <br />To date, the work program is on schedule and within budget. <br />Contact: William Davis, Planning Director <br />5220 Santa Ana Street <br />Cudahy, CA 90201 <br />(213) 773-5143 <br />City of Santa Ana <br />Redevelopment Plan EIR 1-7 <br />