My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DAVID EVANS AND ASSOCIATES (4)
Clerk
>
Contracts / Agreements
>
D
>
DAVID EVANS AND ASSOCIATES (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 11:44:15 AM
Creation date
3/27/2025 3:02:34 PM
Metadata
Fields
Template:
Contracts
Company Name
DAVID EVANS AND ASSOCIATES
Contract #
A-1992-003
Agency
Community Development
Expiration Date
1/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2. Scope of Work (continued) <br />may be required by proposed projects under the Redevelopment Plan. The <br />EIR will describe the existing utility purveyors and facilities that serve the <br />project area. They include: <br />K Natural Gas and --Electric Power - The project team will contact the <br />Southern California Gas Company and the Southern California Edison <br />Company to request information relative to existing and projected service <br />demands in the area. Mitigation measures will include energy <br />conservation practices. <br />Water - DEA will consult with the City Public Works to gather <br />information on the City's water system. Domestic water service will be <br />described, including sources of water and deficiencies of the system. <br />Main water pipe locations serving the project area will be identified. <br />Water consumption with future redevelopment projects is expected to <br />increase. Water conservation measures will be recommended to decrease <br />city-wide consumption. Measures that will ensure adequate water service <br />to future redevelopment projects will be identified. <br />ewer - The project team will review plans of the location and size of <br />existing sewer lines that serve the project area. The EIR will identify the <br />sewer treatment plants serving the City and their available capacity. <br />Sewage generation will be directly related to the type and size of projects <br />constructed under the Redevelopment Plan. DEA will provide factors to <br />estimate future sewage generation. <br />■ Storm Drainage - The EIR will describe the storm drain system serving <br />the project area. City drainage plans will be discussed, along with <br />proposed system improvements. The individual projects of <br />Redevelopment Plan are not expected to generate significant amounts of <br />stormwater runoff. Runoff will be directed into the existing street <br />drainage system. The impacts of future projects constructed under the <br />Redevelopment Plan on the existing storm drainage system will be <br />analyzed. Measures will include recommendations for drainage system <br />improvements, where needed. <br />a Solid Waste - The EIR will describe solid waste collection services in the <br />City. The project team will locate and describe the existing and proposed <br />waste transfer stations and landfill sites that serve the project area. The <br />environmental analysis will discuss potential increases in solid waste, <br />including excavation materials, construction wastes and project waste <br />generation. Mitigation measures will focus on ways to reduce trash and <br />City of Santa Ana <br />Redevelopment Plan EIR 2-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.