My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON 1B -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON 1B -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2013 11:29:26 AM
Creation date
2/26/2008 11:25:27 AM
Metadata
Fields
Template:
Contracts
Company Name
POSITRON
Contract #
A-2004-229-002
Agency
POLICE
Insurance Exp Date
12/31/2008
Destruction Year
0
Notes
A-2004-229; PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F ~~~~!~~~ <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Prepare finallQjCAD Technical Specification documents. <br />b. Supplement the interface control document, as required as per Attachment A-G. <br />c. Provide a draft version of documents, with an opportunity for Santa Ana to identify any <br /> <br />errors or omissions. <br /> <br />d. Correct documentation within forty five (45) days of Santa Ana's review (if necessary). <br />e. Prepare final Positron mobile As-Built Specification documents. <br /> <br />f. Prepare final interface control documents for each interface installed. <br /> <br />g. Incorporate mutually agreed-to revisions into the supplemented documentation <br />described above and deliver a set of final documents to Santa Ana. <br /> <br />Santa Ana shall: <br /> <br />a. Review the IQjCAD technical specifications and interface control documents (described <br />above) submitted by Positron and identify in writing any specific errors and/or <br />omissions found within twenty (20) business days of receipt. <br />b. Review the Positron As-Built specification documents submitted by Positron and identify <br />in writing any specific deficiencies found within twenty (20) business days of receipt. <br /> <br />c. Review the final interface control documents submitted by Positron and identify in <br />writing any specific deficiencies found within twenty (20) business days of receipt. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete upon Santa Ana's acceptance of the finalized IQjCAD technical <br />specification and interface control documents, following a review and correction process and <br />upon submittal of the finalized Santa Ana accepted Positron as-built specification and interface <br />control documents <br /> <br />CHANGE ORDER #2 to Computer Aided Dispatch Purchase Agreement A-2004-229 <br />Exhibit A.1 - IQlCAD System Statement of Work <br /> <br />Page 22 of 149 <br /> <br />f <br />
The URL can be used to link to this page
Your browser does not support the video tag.