Laserfiche WebLink
<br />F ~~~~!~~~ <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Prepare finallQjCAD Technical Specification documents. <br />b. Supplement the interface control document, as required as per Attachment A-G. <br />c. Provide a draft version of documents, with an opportunity for Santa Ana to identify any <br /> <br />errors or omissions. <br /> <br />d. Correct documentation within forty five (45) days of Santa Ana's review (if necessary). <br />e. Prepare final Positron mobile As-Built Specification documents. <br /> <br />f. Prepare final interface control documents for each interface installed. <br /> <br />g. Incorporate mutually agreed-to revisions into the supplemented documentation <br />described above and deliver a set of final documents to Santa Ana. <br /> <br />Santa Ana shall: <br /> <br />a. Review the IQjCAD technical specifications and interface control documents (described <br />above) submitted by Positron and identify in writing any specific errors and/or <br />omissions found within twenty (20) business days of receipt. <br />b. Review the Positron As-Built specification documents submitted by Positron and identify <br />in writing any specific deficiencies found within twenty (20) business days of receipt. <br /> <br />c. Review the final interface control documents submitted by Positron and identify in <br />writing any specific deficiencies found within twenty (20) business days of receipt. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete upon Santa Ana's acceptance of the finalized IQjCAD technical <br />specification and interface control documents, following a review and correction process and <br />upon submittal of the finalized Santa Ana accepted Positron as-built specification and interface <br />control documents <br /> <br />CHANGE ORDER #2 to Computer Aided Dispatch Purchase Agreement A-2004-229 <br />Exhibit A.1 - IQlCAD System Statement of Work <br /> <br />Page 22 of 149 <br /> <br />f <br />