My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON 1B -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON 1B -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2013 11:29:26 AM
Creation date
2/26/2008 11:25:27 AM
Metadata
Fields
Template:
Contracts
Company Name
POSITRON
Contract #
A-2004-229-002
Agency
POLICE
Insurance Exp Date
12/31/2008
Destruction Year
0
Notes
A-2004-229; PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />II ~~~J~~~~ <br /> <br />2. Perform Administrator Training <br /> <br />Objective: <br /> <br />Review and subsequently document system tailoring pursuant to Attachment A- <br />6 and configuration requirements for the following: Positron IQjCAD, Positron <br />IQjMobile and any interfaces provided under this agreement. <br /> <br />Task Description: <br /> <br />Positron will begin preparation of the system specification and interface control documentation <br />for all supplied software and interfaces. <br /> <br />Review meetings will be held for each application subsystem to be installed in order to validate <br />all requirements for tailoring as per Attachment A-6, configuration and the implementation of <br />external interfaces as identified in the above referenced Proposal and the interface control <br />document and in Attachment A-6. <br /> <br />Using Positron's interface Technical Description Documents interface control documents (ICD), <br />Positron will work with the appropriate Santa Ana staff to validate and document all tailoring as <br />per Attachment A-6 and configuration requirements for each subsystem and for each interface <br />to be installed. This information will be summarized in a Change List document to be mutually <br />agreed upon by Positron and Santa Ana. <br /> <br />Santa Ana considers standard system tailoring as per Attachment A-6 to include the renaming <br />of agency-specific data elements and the reformatting of existing data-entry screens, as well as <br />defining Site-specific parameters <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Review, with Santa Ana personnel, Positron's Technical Description Documents and <br />validate those items to be tailored pursuant to Attachment A-6 and configured. <br /> <br />b. Conduct detailed system demonstrations where necessary to aid in the requirements <br />validation process. <br /> <br />c. Review the IQjCAD and Positron IQjMobile Technical Description Documents with the <br />appropriate Santa Ana personnel and document any changes and/or corrections that <br />are mutually agreed upon in a Change List. <br /> <br />CHANGE ORDER #2 to Computer Aided Dispatch Purchase Agreement A-2004-229 <br />Exhibit A.1 - IQ/CAD System Statement of Work <br /> <br />Page 23 of 149 <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.