Laserfiche WebLink
<br />fl1'f 1.~I~"r rffl'rrnr~'1 '1-r~1'~11 l' I~'" T~f'lr!11 1 '1IT11~~l~"rr'~HJ r rwn ~n~'1 ~1 rmr r,fj ~rlll~ rr1r ~I "1 T ~ In l' nrJr 11 1 ' IP 'II I rlll~rf 11 '1' I I I <br /> <br />P ~~~~!~ys~~ <br /> <br />c. Provide one (1) complete set of technical and user manuals for all Positron subsystems <br />installed in the form of reproducible black & white masters and machine-readable <br />documents in pdf., Microsoft Word 97 or higher format, based upon Positron's <br />documentation standard at the time of delivery. Documentation may not be password <br />protected. <br /> <br />d. Allow Santa Ana to videotape any training class for the purpose of presentation to <br />future Santa Ana training classes. <br /> <br />e. The number and duration of training classes to be provided are defined in the attached <br />Training Plan. <br /> <br />Santa Ana shall: <br /> <br />a. Designate and assign personnel to receive training in groups not to exceed the class size <br />listed in the training plan. <br /> <br />b. Santa Ana will provide the necessary classrooms, facilities, materials, copies of <br />documentation, networks and lines to data terminals, personal computers and PC <br />operating system software, and related equipment to support training classes. This <br />includes one full-function workstation per student, one full-function workstation for the <br />instructor, an LCD, a projection screen, a whiteboard and connectivity to the server. <br /> <br />c. Provide sufficient copies of the documentation supplied by Positron to support all <br />students in the training classes. <br /> <br />d. Ensure that appropriate Santa Ana Training personnel and system administrator are <br />available to actively participate in the scheduled training programs. <br /> <br />e. Ensure that Santa Ana personnel to receive IQjCAD training are proficient in the use of <br />Microsoft Windows functionality. <br /> <br />f. Provide any desired video taping equipment and services for the purpose of taping <br />training classes for the purpose of future training of Santa Ana staff. <br /> <br />g. Assume responsibility for travel and per diem expenses for Santa Ana staff for any off- <br />site training classes mutually agreed upon by Santa Ana and Positron. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when the scheduled technical and user training on each <br />installed subsystem is completed. <br /> <br />CHANGE ORDER #2 to Computer Aided Dispatch Purchase Agreement A-2004-229 <br />Exhibit A.1 - IQlCAD System Statement of Work <br /> <br />Page 30 of 149 <br /> <br />~ <br />