My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON 1B -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON 1B -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2013 11:29:26 AM
Creation date
2/26/2008 11:25:27 AM
Metadata
Fields
Template:
Contracts
Company Name
POSITRON
Contract #
A-2004-229-002
Agency
POLICE
Insurance Exp Date
12/31/2008
Destruction Year
0
Notes
A-2004-229; PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~n1l'~"il'wr''I'",~III111IIPIrIII!I'I~'' I~ !~~1'~1~111' ml~'r'I' I~ mlmDlllllJlflllffillITII' ITIII'IIH'11IMil 'rIm II'! '''I I <br /> <br />P ~~~f.r~~ <br /> <br /> <br />b. Demonstrate all inter-system communications between installed Positron systems and <br />between Positron and non-Positron systems, according to the IQjCAD Technical <br />Specification documentation, the original and amended Positron IQjMobile <br />documentation, Positron's IQjCAD ATP, Positron's ATP and the interface control <br />document. <br /> <br />c. Assist Santa Ana in testing each interface. <br /> <br />d. Review and correct any discrepancies that are identified by Santa Ana prior to final <br />system acceptance and payment. <br /> <br />e. Provide software or documentation corrections as needed to correct the discrepancies <br />prior to IQjCAD Final Certification. <br /> <br />Santa Ana shall: <br /> <br />a. Conduct test procedures and verify all inter-system communications between installed <br />Positron systems and between Positron and non-Positron systems to ensure <br />conformance with the approved IQjCAD documentation, the original and amended <br />Positron IQjMobile documentation, Positron's IQjCAD ATP, Positron's ATP and the <br />interface control document. <br /> <br />b. Identify in writing each discrepancy between subsystem and ancillary system <br />functionality and the IQjCAD documentation, the original and amended Positron <br />IQjMobile documentation, Positron's IQjCAD ATP, Positron's ATP and the interface <br />control document within ten (10) business days. <br /> <br />c. Work with Positron to identify the type of correction needed to ensure that each <br />subsystem and ancillary system conforms to the IQjCAD documentation, the original <br />and amended Positron IQjMobile documentation, Positron's IQjCAD ATP, Positron's <br />ATP and the interface control document. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when the folloWing internal and external interfaces and other <br />Positron licensed software has been verifiably operational according to the IQjCAD <br />documentation, the original and amended Positron IQjMobile documentation, Positron's <br />IQjCAD ATP, Positron's ATP and the interface control document: <br /> <br />· Computer Aided Dispatch Subsystem: Positron IQjCAD Version 3.6.5xx (or current <br />version at time of installation) <br /> <br />CHANGE ORDER #2 to Computer Aided Dispatch Purchase Agreement A-2004-229 <br />Exhibit A.1 - IQlCAD System Statement of Work <br /> <br />Page 39 of 149 <br /> <br />N~ <br />\ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.