My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON 1B -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON 1B -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2013 11:29:26 AM
Creation date
2/26/2008 11:25:27 AM
Metadata
Fields
Template:
Contracts
Company Name
POSITRON
Contract #
A-2004-229-002
Agency
POLICE
Insurance Exp Date
12/31/2008
Destruction Year
0
Notes
A-2004-229; PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />"~!'llrlrl"'''111I''HI[I'''lm III~' I' '111'11"'llll!l'~1'11111'1 r 1IIITIU~llllrr11'1~11'111" 1 ',' 1'1' qr II <br /> <br />P ~~~!~~ <br /> <br /> <br />b. Certify all applicable software and subsystems as ready for functional testing. <br /> <br />c. Review any discrepancies in functionality identified by Santa Ana. <br /> <br />d. Software or documentation shall be corrected prior to IQjCAD Final Certification as <br />needed to correct the discrepancies as identified. <br /> <br />e. Test the baseline functionality of the IQjCAD subsystem according to an agreed upon <br />set of testing scenarios. <br /> <br />Santa Ana shall: <br /> <br />a. Generate production data files needed for functional testing. <br /> <br />b. Document each discrepancy between the IQjCAD subsystem functionality and the <br />Updated IQjCAD RFP response and the system acceptance test plan material. <br /> <br />c. Work with Positron to identify the type of correction needed to ensure that the <br />subsystem conforms to the testing criteria. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when IQjCAD has been demonstrated to operate in accordance <br />with the Updated Positron IQjCAD RFP response and the system acceptance test plan criteria. <br /> <br />Objective: <br /> <br />Perform integration testing of the IQjCAD subsystem, Positron IQjMobile and <br />other interfaces. <br /> <br />Task Description: <br /> <br />Demonstrate all internal and external interfaces to ensure that the combined IQjCAD <br />subsystem, and Positron IQjMobile application operate as defined in the IQjCAD documentation <br />as per the Project Schedule, the original and amended Positron IQjMobile documentation, <br />Positron's IQjCAD ATP, Positron's ATP and the interface control document. Santa Ana staff will <br />conduct the integration testing. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Certify the interfaces as ready for integration testing. <br /> <br />CHANGE ORDER #2 to Computer Aided Dispatch Purchase Agreement A-2004-229 <br />Exhibit A.1 - IQlCAD System Statement of Work <br /> <br />Page 38 of 149 <br /> <br />~J6- <br />t <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.