My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - ENGINEERING SVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
03/03/2008
>
25H - ENGINEERING SVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:33:07 PM
Creation date
2/27/2008 1:33:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25H
Date
3/3/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Avenue/First Street), and roadway segment along the Grand Avenue between First Street and Fourth Street. <br />Study limits and locations will be confirmed in consultation with City and Caltrans staff. Intersection analyses <br />for both a.m. and p.m. peak hour conditions will be conducted utilizing City traffic impact analysis guidelines <br />and prescribed analysis methodologies. Roadway segments will be analyzed using the City's maximum <br />roadway capacity LOS tables, and the study intersections will be analyzed using the Intersection Capacity <br />Utilization method. <br />URS will develop future baseline (No Project) traffic volumes using the latest approved City traffic model <br />projections. Future No Project Alternative LOS analysis will be conducted at the study intersections and <br />roadway segment. Based on the proposed build alternatives, URS also will conduct Future Build Project <br />Alternatives LOS analysis at the study intersections and roadway segment. The traffic analysis also will <br />provide, as necessary, traffic mitigation measures at impacted locations for inclusion in the CEQA and NEPA <br />documents. <br />Assumptions/Deliverables: <br />A total of five copies each of the draft and final technical studies will be delivered. <br />Draft technical studies will be reviewed no more than once each by the City and Caltrans (allowing <br />for one round of revision per comments issued by the City and Caltrans). <br />Task 3- PrepareDr~ NEP f~ EA <br />Per the City's RFP, aNEPA-compliant EA will be prepared pursuant to Caltrans' SER, Volume 1, Chapter <br />31 [Environmental Assessment (EA) and Finding of No Significant Impact (FONSI)]. The separate EA will <br />be prepared and conform to the current annotated EA outline included on Caltrans' SER. Preparation of the <br />EA also will conform to the reporting requirements and procedures (e.g., Environmental Document Review <br />Process) pursuant to the SAFETEA-LU NEPA Pilot Program Section 6005 MOU as set forth in Volume 1, <br />Chapter 38 (NEPA Delegation) of Caltrans' SER. It is assumed that the EA will address the same build and <br />no build altematives addressed in the City's originally certified EIR; it is assumed that no additional build <br />alternatives will require assessment than that addressed in the 2002 EIR. If a higher level NEPA document is <br />determined to be required, then this will be communicated to the City and ascope/cost amendment for this <br />work will be provided. <br />Using the information contained in the technical reports, along with additional information and analyses that <br />are performed as necessary, a Screencheck Draft EA will be prepared and submitted to the City and Caltrans <br />for concurrent review. The document will be submitted with the NEPA QA/ QC signature sheet and <br />Environmental Document Review Checklist for Draft Environmental Documents. Following the City and <br />Caltrans review of the Screencheck EA, URS will revise the document as necessary. Following a comment <br />resolution meeting with the City and Caltrans, URS will prepare the Draft EA with a response to comment <br />matrix and submit the document to the City and Caltrans for final concurrence. It is assumed that no <br />additional comments will be received as part of the concurrence review. It too is assumed that the project will <br />be consigered a "routine" EA, and, therefore the Draft EA will not require review by Caltrans Headquarters. <br />After approval and signature of the Draft EA by Caltrans, the document will be circulated for public review <br />and comment. <br />Assu m ptions/Deliverables: <br />A total of 10 copies of the Screencheck Draft EA will be delivered. <br />A total of 10 copies of the Draft EA will be delivered following the revisions workshop. <br />A total of 10 copies and two electronic PDF copies of the Final Draft EA will be delivered to the <br />City and Caltrans. <br />No more than 40 copies of the Draft EA will be delivered for public circulation to interested parties <br />and agencies. <br />12 <br />25H-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.