Laserfiche WebLink
• • <br />Table of Contents <br />Section 1 Organization and Credentials <br />1.1 Project Partners' Unique Benefits <br />1.2 Overview of Public Sector Use of Temporary Employees <br />1.2.1 Background on the MWD and Other Class Action Lawsuits <br />1.2.2 What Does This Means For The City of Santa Ana? <br />1.3 The Project Partners' Solution <br />1.3.1 Project Partners' Operational Procedure <br />1.3.2 Staff Manager <br />1.3.3 Automatic Documentation <br />1.3.4 Training <br />1.3.5 Communication Access <br />1.4 Designated Representative <br />Section 2 Sample Resumes <br />2.0 Overview of Sample Resumes <br />Sample Engineering / Technical Category <br />Larry Rein, P.E. — Senior Civil Engineer <br />Elise DuBois - Assistant Engineer <br />Sample Construction Category <br />Joseph Apohen - Construction Inspector <br />Section 3 References <br />City of Santa Ana <br />City of Anaheim <br />City of Arcadia <br />City of San Juan Capistrano <br />City of Santa Monica <br />City of Torrance <br />City of Glendale <br />City of Ontario <br />City of Fullerton <br />Section 4 Certifications <br />Certification if Non -Discrimination by Consultants <br />Section 5 Cost and Price (Provided in separate envelope) <br />