My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - CARD ACESS SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
04/07/2008
>
25I - CARD ACESS SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:32:43 PM
Creation date
4/2/2008 11:29:41 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25I
Date
4/7/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" . <br /> <br />.. <br /> <br />Project: Access Control Upgrade <br />Customer Reference: <br />SimplexGrinnell Reference: 432406668 <br />Date: 03/13/2008 <br />Page 3 of 3 <br /> <br />SimplexGrinnell Quotation <br />Comments (continued) <br />5, A one year warranty is included from the date of final acceptance from the authority <br />having jurisdiction, <br />6, All work is to be done during normal working hours, <br />7, Lead Time on equipment is normally 2 weeks (special orders and/or other vendor <br />items may require additional lead time). <br />8. All conduits not installed by SimplexGrinnell shall be furnished with pull lines. <br />9. All devices and wire are to be installed in conduit and boxes. The owner/contractor <br />shall install the conduit and boxes as designed by SimplexGrinnell shop drawings, <br />Deviations to said plans will only be made with the written approval of a <br />SimplexGrinnell representative. Deviations made without written consent may <br />result in added engineering material and/or labor cost. <br />10, Project delays caused by unauthorized modifications are the responsibility of the <br />contractor, <br />11, Allow, at least, 2-3 working days from the date requesting service for installers / <br />inspectors to be on-site. <br />12. Lead Time on engineered plans is normally 4 weeks after receiving a usable CAD <br />disk or e-mailed CAD file(s) once project is awarded, <br /> <br />Fire, Security, Communications, Sales & Service <br />Offices & Representatives in Principal Cities throughout North America <br /> <br />251-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.