My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ANN CHRISTOPH LANDSCAPE ARCHITECT ASLA 1A - 2008
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
A (INACTIVE)
>
ANN CHRISTOPH LANDSCAPE ARCHITECT ASLA 1A - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 3:23:54 PM
Creation date
4/14/2008 9:01:33 AM
Metadata
Fields
Template:
Contracts
Company Name
ANN CHRISTOPH LANDSCAPE ARCHITECT ASLA
Contract #
A-2008-050
Agency
Public Works
Council Approval Date
3/3/2008
Insurance Exp Date
10/1/2010
Destruction Year
2014
Notes
workers's comp exp 10-01-09 profess. liability exp 1-14-2010 Amends A-2006-270
Document Relationships
ANN CHRISTOPH LANDSCAPE ARCHITECT ASLA 1 - 2006
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\A (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tierra de las Pampas <br />January 25, 2008 <br />Page 4 <br />C. Architecture <br />The architect, GPRA, will provide architectural services, with sub - consultants for <br />structural, mechanical, plumbing and electrical systems for the buildings and gates. In <br />addition the electrical engineer sub - consultant will provide site electrical. The architect's <br />scope of work includes: <br />1. Concrete masonry anteater night building per attached. <br />2. Pampas gateway at the Rhea/ guanaco area. <br />D. Irrigation Design <br />Art Guy of BGB, Inc. will provide irrigation plans and details. His services will include: <br />1. Meeting with Zoo maintenance staff to establish preferred irrigation equipment <br />list, potential point of connection, available static pressure, mainline routing, <br />existing valve and other irrigation equipment locations. <br />2. Review alternative methods of irrigating the anteater and guanaco and rhea <br />compounds. <br />3. Prepare irrigation plans and details. <br />E. Botanical Consultant, Dr. Phil Rundel, will provide input on the details of habitat <br />design. <br />Task 3 - Complete Construction Documents <br />A. Prepare technical specifications in book format to meet City requirements. City will <br />provide boilerplate sections and bid form. <br />B. Prepare estimate of probable construction cost. <br />C. Drawings to be signed and stamped by the appropriate design professional. <br />Submittals: <br />Submit drawings at 507o, 907o and 100 %. Respond to City plan check comments. <br />Allow 2 meetings with staff and Design Review Team during this phase <br />TASK - 4 Biddin <br />A. Respond to requests for information and clarification. <br />B. Attend pre -bid meeting (Landscape Architect and Architect) <br />TASK 5 - Construction Suyport <br />A. Attend pre- construction meeting. (Landscape Architect and Architect) <br />
The URL can be used to link to this page
Your browser does not support the video tag.