Laserfiche WebLink
Santiago Nature Reserve <br />January 18, 2008 <br />Pa eg_4 <br />B. Restoration Design— Restoration Ecologist, Margot Griswold of Earthworks, will <br />provide criteria and instructions for the restoration areas. Her services will include: <br />1. Evaluate the setting for the vernal pool. Based on the soils analysis, methods <br />will be determined to create the water - holding capacity of the vernal pool. <br />2. Research the feasibility and regulatory processes involved in introducing <br />animal species to the vernal pool habitat. <br />3. Provide species lists, planting and seeding specifications, and maintenance <br />guidelines for grassland and vernal pool habitats. <br />C. Irrigation Design <br />Art Guy of BGB, Inc. will provide irrigation plans and details. His services will include: <br />1. Meeting with park maintenance staff to establish preferred irrigation <br />equipment list, potential point of connection, available static pressure, mainline <br />routing, existing valve and other irrigation equipment locations. <br />2. Review options for irrigation techniques for establishment of grassland. <br />3. Prepare irrigation plans and details. <br />D. Paul Kandarian, Southland Energy Consultants will provide the following services: <br />1. Electrical design, energy compliance documentation, single line diagrams and <br />panel schedules. <br />TASK 4 - Complete Construction Documents <br />A. Prepare technical specifications in book format to meet City requirements. City to <br />provide boilerplate sections and bid form. <br />B. Prepare estimate of probable construction cost. <br />C. Drawings to be signed and stamped by the appropriate design professional. <br />Submittals: <br />Submit drawings at 907o and 1007o. Respond to City plan check comments. <br />Allow 2 meetings with City Staff during this phase <br />TASK 5 - Biddin& Services during bidding will be provided on an hourly basis <br />when requested by City. <br />TASK 6 - Construction Support Services, such as performing site visits and <br />reports will be provided on an hourly basis when requested by City. <br />TASK 7 - Post - Construction Support Services, such as performing follow -up site <br />visits, making recommendations and writing reports will be provided on an <br />hourly basis when requested by City. <br />