My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ANN CHRISTOPH LANDSCAPE ARCHITECT ASLA 1A - 2008
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
A (INACTIVE)
>
ANN CHRISTOPH LANDSCAPE ARCHITECT ASLA 1A - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 3:23:54 PM
Creation date
4/14/2008 9:01:33 AM
Metadata
Fields
Template:
Contracts
Company Name
ANN CHRISTOPH LANDSCAPE ARCHITECT ASLA
Contract #
A-2008-050
Agency
Public Works
Council Approval Date
3/3/2008
Insurance Exp Date
10/1/2010
Destruction Year
2014
Notes
workers's comp exp 10-01-09 profess. liability exp 1-14-2010 Amends A-2006-270
Document Relationships
ANN CHRISTOPH LANDSCAPE ARCHITECT ASLA 1 - 2006
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\A (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santiago Nature Reserve <br />January 18, 2008 <br />Pa ee33 <br />Part 2 Amphitheater and related site improvements (continued) <br />• There should be electrical service to the amphitheater. Low level site lighting is <br />planned, with possible relocation or separate switching of the existing light near <br />the amphitheater site. <br />• Decomposed granite pathways are to be provided bringing people from the <br />parking area to the building and to the amphitheater. There will also be a <br />walkway paralleling the stream bed that can also be used by service vehicles. <br />• Small group campsites to be relocated. These sites will include a flat tent site pad, <br />a table and a barbeque /fire pit. <br />• Steel bollards, steel gate, and monument sign are to be removed. Wood gates and <br />wood fencing and with stone pilasters would be installed instead. <br />• Storm drain and other site utilities must be taken into account in the design. <br />B. Planning Services <br />1. Prepare base sheet/ site plan. <br />2. Prepare landscape plan sketch for City staff review. <br />3. Present two alternative designs/ materials for the amphitheater design. <br />4. Design site layout to include restoration considerations as recommended by <br />restoration ecologist, Margot Griswold. <br />5. Review planting list and planting concepts with City Staff. <br />6. Respond to comments and prepare final preliminary site/ landscape plan. <br />(Allow 2 meetings with City Staff during this phase) <br />TASK 3 - Development of Construction Drawings <br />A. Landscape Architecture <br />The landscape architect will provide the following services: <br />1. Coordination with sub - consultants and design oversight <br />2. Site demolition plan <br />3. Site construction plan with construction notes and dimensioning based on the <br />building and existing site features. <br />3. Landscape grading plan. Note: This would not include grading quantities, <br />drainage appurtenances, civil engineering, or civil engineering grading notes. <br />4. Concept lighting and light fixture suggestions <br />5. Design details for amphitheater, pathways, and fencing <br />6. Work with restoration ecologist to finalize design and specifications for <br />restoration areas. <br />7. Planting plan <br />8. Cover sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.