Laserfiche WebLink
EXHIBIT A <br />FLORAL PARK NEIGHBORHOOD <br />STREET LIGHT REPAIR SPECIFICATIONS <br />I. <br />SCOPE OF WORK <br />The Request for Proposal calls for repairs of the existing street light system in the Floral <br />Park Neighborhood due to age and deterioration. The Floral Park Neighborhood is <br />located in the north part of the City and is bounded by Riverside Drive on the north, <br />Flower Street on the west, 17t~ Street on the south, and Broadway on the east. This <br />project will include the replacement of all cable, replacement of portions of deteriorated <br />conduit where required, removal of potheads from street light poles, removal of pull <br />boxes and installation of new globes in the North Park circuit, North Residential circuit <br />and Broadway circuit. <br />The Floral Park Neighborhood is a high voltage series street lighting system that was <br />installed in the early 1920's. The neighborhood has witnessed numerous power outages <br />which are becoming more frequent. The system repairs have been "piecemealed" over <br />the years and it is unknown how much, if any, of the existing conduit may need to be <br />replaced. <br />The conduit in that area is old and deteriorated. The City is considering two options - <br />replacing all conduit and utilizing existing conduit. Pricing requested from the <br />Contractor will include both options. <br />The lead casing that surrounds the existing cable is possibly considered hazardous <br />material for disposal purposes. Staff will confirm the cable disposal and/or recycling <br />options and send you an addendum on this issue. <br />The Floral Park Neighborhood has approximately 57,000 linear feet of cable: <br />Circuit <br />• North Park Circuit - 22, 000 feet <br />• North Residential Circuit - 30,000 feet <br />• Broadway Circuit - 5,000 feet <br />Not to exceed budget (excluding <br />conduit replacement and unforeseen <br />circumstances) <br />$392,136.00 <br />$526,772.00 <br />$ 92,315.00 <br />The scope of work includes the following details: <br />• Replace all cable using existing conduit. <br />• Replace deteriorated conduit only if it is more cost effective to replace than to <br />work with existing conduit, as directed by the Director. <br />t2 <br />251-17 <br />