My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - STREET LIGHTING REPAIRS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
05/05/2008
>
25I - STREET LIGHTING REPAIRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:32:00 PM
Creation date
4/30/2008 1:49:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25I
Date
5/5/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Rated for operation at 5,000 volts. <br />3. 2.8mm polyethylene insulation per Power Cable Engineers Association. <br />4. Approved oil resistant rubber tape and vinyl chloride tape for splicing. <br />C. GLOBES <br />1. Polycarbonate white textured <br />2. Acorn style globe (matching existing) <br />3. Size <br />North Park and North Residential areas <br />a. 15" x 23 '/z" x 8" <br />Broadway <br />a. 16" x 27" x 9" <br />D. CONCRETE <br />Replacement concrete must match existing concrete. <br />III. FUNCTIONS AND RESPONSIBILITIES <br />A. DIRECTOR <br />The Director shall have the authority to acceptlreject materials, workmanship and to <br />make minor changes in work or schedule. When the performance of the work or <br />completion per schedule is determined to be sub-standard, he may (1) recommend <br />that all or a portion of payment be withheld, and/or forfeiture for delay be assessed; <br />(2) direct the work be accomplished by a separate contractor, in order to complete <br />the necessary work as close to schedule as possible, and withhold the resulting <br />costs. Payment to be withheld shall be deducted from the next monthly payment <br />due the Contractor, or if the amount is insufficient to cover payment, the Contractor <br />shall be liable and will be billed accordingly. <br />The Director, or his authorized representative, shall decide all questions, which may arise as <br />to the manner of performance and completion per schedule, acceptable fulfillment of the <br />contract by the Contractor, interpretation of the specifications, and compensation to include <br />completion of work by alternate sources. <br />B. CONTRACTOR <br />(1) Local Office <br />The Contractor shall maintain a local office with a competent representative <br />who can be reached during normal working hours and authorized to discuss <br />matters pertaining to this contract with the Director. A local office is one <br />2511419 <br />
The URL can be used to link to this page
Your browser does not support the video tag.