My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - THIN OVERLAY PHASE 2
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
05/05/2008
>
23A - THIN OVERLAY PHASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:31:52 PM
Creation date
4/30/2008 2:19:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23A
Date
5/5/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Street Pavement Rehabilitation - <br />Thin Overlay Phase 2 <br />May 5, 2008 <br />Page 2 <br />Santa Ana Contractors receiving notices: 12 <br />Contractors requesting bidding documents: 14 <br />Bids received: 4 <br />Bids received from Santa Ana Contractors: 0 <br />NAME OF BIDDER CITY <br />1. Palp Inc. DBA Excel Paving Company Long Beach <br />2. All American Asphalt Corona <br />3. R. J. Noble Company Orange <br />4. Sulley-Miller Contracting Co. Anaheim <br />BASE BID <br />AMOUNT <br />3,779,755 <br />3,786,786 <br />3,986,615 <br />4,240,935 <br />A total of four bids were received and all were responsive. The lowest <br />base bid was submitted by Palp Inc. DBA Excel Paving Company, for <br />$3,779,755, which is above the Engineer's estimate of $3,532,210. <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the proposed <br />project is exempt from future review. Categorical Exemption Environmental <br />Review No. 2008-73 will be field for the project. <br />FISCAL IMPACT <br />The funding analysis shows a total estimated construction cost of <br />$4,604,600 for the project (Exhibit 2). Funds are available in the <br />Residential Street Improvement Fund (account no. 058-552-6631). <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />es G. Ross ~F_rancisco Gutierrez ~;~ <br />cutive Director Executive Director <br />lic Works Agency Finance & Mgmt. Services Agency <br />K:\Construction\RFCA-draft\OS-O5-2008 Overlay2 OB-1736-c ET_doc 80wd <br />23A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.