My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:43:18 PM
Creation date
5/8/2008 3:41:47 PM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE)
Contract #
A-2008-085
Agency
PUBLIC WORKS
Council Approval Date
5/5/2008
Insurance Exp Date
5/1/2011
Destruction Year
2022
Notes
Professional ins exp 04/30/2011; Auto exp 11/01/11 Amended by A-2009-010
Document Relationships
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) (2) - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. Address cracks, waterproofing, and leakage at the foundation of the fountain and <br />restore interior finish. <br />2. Install new spray center jet. <br />3. Provide new lighting for the fountain. <br />4. Replace electrical panel and plumbing system (including the water pump system) in <br />the existing equipment room. <br />5. Assess all existing electrical and plumbing systems (including electrical panel) <br />required for the proposed fountain performance. Address all existing electrical and <br />plumbing systems lacking the capability of handling the new systems. <br />6. Remove and replace the existing concrete coping and sloped cobblestone veneer <br />around the fountain with new materials per the City instructions. <br />7. Install skatestopper around the fountain edge. <br />8. Construct a storage room for chlorine, carbon dioxide, and acid systems (optional <br />design feature). <br />2. Utility Coordination and Design – All impacted utility lines within the project limits shall be <br />compiled on utility base plans and forwarded to each utility agency for review, correction, and <br />certification of accuracy. Consultant shall copy the City of Santa Ana on all transmittals, <br />notifications, submittals and letters to the utility agencies. Consultant shall coordinate any <br />necessary utility designs with utility agencies. <br />3. Electrical Design – The details of electrical circuiting and riser diagrams, primary wiring and <br />conduit, transformers, and electrical panel shall be drawn on the electrical plans. Consultant <br />shall provide any additional necessary details for construction and operation purpose. <br />Consultant is providing an allowance to subcontract the services of an electrical engineer <br />to provide power to mechanical equipment, lights and control panel for the fountain <br />system. Electrical plans to include single line diagram, load calculations, panel schedule <br />(if needed), electrical site plan, and equipment wiring diagram. Consultant shall <br />coordinate with design team to determine if a pad transformer and service entrance and <br />meter section will be required as part of the design. <br />4. Structural Design – The design of waterproofing and its protection shall be provided for the <br />edges, walls and bottoms of the fountain. Consultant is providing an allowance to subcontract <br />the service of a structural engineer to verify that the footings and walls of the pool and <br />fountain perform in accordance with the current California Building Code (CBC). The <br />structural engineer shall also provide recommendations for the pool edge repair. <br />5. Mechanical Design – The new pump system at Fountain No. 3 shall be designed to operate <br />fountain center jet. Consultant shall provide details for piping, valves, fittings, pump <br />equipment, and any additional necessary elements. Specifications shall include pumps and <br />piping manifold layouts. <br />Consultant is providing an allowance to subcontract the service of a mechanical engineer <br />to evaluate the ventilation condition in the fountain equipment room and pool building. <br />All other pumps and piping design are included in the tasks above. <br />6. Plans Preparation - The plan development shall include at least two (2) plan deliverables - <br />95% (pre -final) and 100% (final). Each project shall be prepared separately under different <br />title sheet. Plans shall be prepared in conformance with City of Santa Ana standards. The <br />necessary plans shall include, but not be limited to: <br />1. Plan <br />i. Title Sheet <br />ii. Layout and Dimensions (Memorial Pool to be drawn at a maximum scale of <br />'/8" = 1' and Plaza of the Fountains at maximum scale of %" = 1') <br />
The URL can be used to link to this page
Your browser does not support the video tag.