Laserfiche WebLink
iii. Equipments and Parts Details (All sheets to be drawn at a scale clearly <br />showing all details or to be determined by the reviewing engineer) <br />iv. Demolition Plans — all items to be removed (All sheets to be drawn at a <br />scale clearly showing all details or to be determined by the reviewing <br />engineer) <br />v. Mechanical and Electrical Details (All sheets to be drawn at a scale clearly <br />showing all details or to be determined by the reviewing engineer) <br />vi. Pool Markings (lane line, target and depth marking) <br />vii. Miscellaneous Deck Equipment Location (diving boards, lifeguard chairs, <br />handrails) <br />2. Sections <br />viii. Transverse Sections <br />ix. Longitudinal Sections <br />x. Depths <br />3. Construction Details <br />xi. Underwater Lighting Details <br />xii. Structural Detail of Pool (expansion joint, water proofing and plaster detail, <br />deck edge) <br />xiii. Equipment Details inside the Equipment Room <br />7. Specifications — Consultant shall prepare construction specifications for items of work shown <br />on the construction plans. Specifications shall include the City of Santa Ana's boiler plate <br />special provisions. The technical special provisions shall be included in the Appendices <br />based on "Greenbook" Standard Specifications for Public Works Construction, 2003 Edition <br />with 2005 Cumulative Supplement. Specifications shall be stamped and signed by the <br />responsible engineer. <br />A list of contract pay items with the descriptions, item codes and estimated quantities shall <br />be included in the front of the special provisions. Pay items shall reference the <br />specification section defining the measurement and payment. <br />8. Cost Estimate — Consultant shall prepare an updated engineer's opinion of probable <br />construction costs and estimate quantities for construction items shown on the plans. Cost <br />estimates shall be prepared and submitted at each milestone along with the plans and <br />specifications. <br />Quantities for all contract pay items shall be substantiated by calculations. Quantity <br />calculations shall be neat, orderly and shall show all sketches, diagrams, and dimensions <br />necessary to allow them to be independently used by field inspectors during construction. <br />The source of unit cost data shall be included. Lump sum items shall include a breakdown <br />of major components along with adequate cost backup justifying the total lump sum cost. <br />9. Submission Format — PS&E shall be in US Customary English units and shall conform to the <br />City of Santa Ana standards, regulations, policies, manuals, and practices. The Consultant <br />shall provide clear, concise and complete plans, specifications, and estimate. <br />i. Drawings shall be prepared in Microstation V8 format. Submittals shall be <br />24"06" hard copy and to scale. Electronic files shall be submitted at the <br />100% completion level. <br />ii. Electronic copies of the specifications shall be submitted in Microsoft Word <br />format and the cost estimates shall be in Microsoft Excel format. <br />iii. The Consultant shall provide five (5) copies of the PS&E at each submittal <br />to the City of Santa Ana for review. Upon design approval, the Consultant <br />shall submit one (1) set of mylar plan stamped and signed by responsible <br />engineer. <br />