My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:43:18 PM
Creation date
5/8/2008 3:41:47 PM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE)
Contract #
A-2008-085
Agency
PUBLIC WORKS
Council Approval Date
5/5/2008
Insurance Exp Date
5/1/2011
Destruction Year
2022
Notes
Professional ins exp 04/30/2011; Auto exp 11/01/11 Amended by A-2009-010
Document Relationships
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) (2) - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii. Equipments and Parts Details (All sheets to be drawn at a scale clearly <br />showing all details or to be determined by the reviewing engineer) <br />iv. Demolition Plans — all items to be removed (All sheets to be drawn at a <br />scale clearly showing all details or to be determined by the reviewing <br />engineer) <br />v. Mechanical and Electrical Details (All sheets to be drawn at a scale clearly <br />showing all details or to be determined by the reviewing engineer) <br />vi. Pool Markings (lane line, target and depth marking) <br />vii. Miscellaneous Deck Equipment Location (diving boards, lifeguard chairs, <br />handrails) <br />2. Sections <br />viii. Transverse Sections <br />ix. Longitudinal Sections <br />x. Depths <br />3. Construction Details <br />xi. Underwater Lighting Details <br />xii. Structural Detail of Pool (expansion joint, water proofing and plaster detail, <br />deck edge) <br />xiii. Equipment Details inside the Equipment Room <br />7. Specifications — Consultant shall prepare construction specifications for items of work shown <br />on the construction plans. Specifications shall include the City of Santa Ana's boiler plate <br />special provisions. The technical special provisions shall be included in the Appendices <br />based on "Greenbook" Standard Specifications for Public Works Construction, 2003 Edition <br />with 2005 Cumulative Supplement. Specifications shall be stamped and signed by the <br />responsible engineer. <br />A list of contract pay items with the descriptions, item codes and estimated quantities shall <br />be included in the front of the special provisions. Pay items shall reference the <br />specification section defining the measurement and payment. <br />8. Cost Estimate — Consultant shall prepare an updated engineer's opinion of probable <br />construction costs and estimate quantities for construction items shown on the plans. Cost <br />estimates shall be prepared and submitted at each milestone along with the plans and <br />specifications. <br />Quantities for all contract pay items shall be substantiated by calculations. Quantity <br />calculations shall be neat, orderly and shall show all sketches, diagrams, and dimensions <br />necessary to allow them to be independently used by field inspectors during construction. <br />The source of unit cost data shall be included. Lump sum items shall include a breakdown <br />of major components along with adequate cost backup justifying the total lump sum cost. <br />9. Submission Format — PS&E shall be in US Customary English units and shall conform to the <br />City of Santa Ana standards, regulations, policies, manuals, and practices. The Consultant <br />shall provide clear, concise and complete plans, specifications, and estimate. <br />i. Drawings shall be prepared in Microstation V8 format. Submittals shall be <br />24"06" hard copy and to scale. Electronic files shall be submitted at the <br />100% completion level. <br />ii. Electronic copies of the specifications shall be submitted in Microsoft Word <br />format and the cost estimates shall be in Microsoft Excel format. <br />iii. The Consultant shall provide five (5) copies of the PS&E at each submittal <br />to the City of Santa Ana for review. Upon design approval, the Consultant <br />shall submit one (1) set of mylar plan stamped and signed by responsible <br />engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.