My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:43:18 PM
Creation date
5/8/2008 3:41:47 PM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE)
Contract #
A-2008-085
Agency
PUBLIC WORKS
Council Approval Date
5/5/2008
Insurance Exp Date
5/1/2011
Destruction Year
2022
Notes
Professional ins exp 04/30/2011; Auto exp 11/01/11 Amended by A-2009-010
Document Relationships
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) (2) - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 31, 2008 <br />Mr. Kenny Nguyen <br />City of Santa Ana <br />20 Civic Center Plaza, MS M36 <br />P.O. Box 1988 <br />Santa Ana, CA 92702 <br />(714) 647-5360 <br />Re: City of Santa Ana Pool and Fountain Renovation Projects # 9076EP <br />Dear Mr. Nguyen: <br />This letter is in response to your request for clarification of our proposal related to <br />subconsultants. Our scope of work includes the following as it relates to each sub - <br />consultant: <br />Electrical Engineer Sub -Consultant — An electrical engineer will be required to size all <br />necessary electrical components for the redesign of the fountain. This includes single <br />line diagram, load calculations, panel schedule, and equipment wiring diagram. An <br />appropriate service entrance section and meter is already in place, so this is not <br />included in our scope. We anticipate that there will be changes to the fountain to require <br />this scope. This is for the fountain only and does not include the pool. For the pool <br />facility, we anticipate that our electrical engineer will inspect the facilities to be in <br />compliance with any code requirements. A report will be generated that indicate any <br />recommendations that we may have for the facility. Our scope of work will not include <br />any repairs or design based on the recommendations made by our sub consultant. <br />Structural Engineer Sub -Consultant — The structural sub -consultant is included in our <br />scope to review the existing facilities and make recommendations for any renovation that <br />may be necessary. We do not anticipate that there will be any major renovation to the <br />structural integrity of both the fountain and the pool based on our site visit. After our <br />structural subconsultant is done with their review, a report will be generated to document <br />their findings. This is the only scope included related to the structural sub -consultant. <br />Any findings that requires a redesign of the facility is not included in our proposal. <br />Hopefully this clarifies any questions you may have on the issue. If you require further <br />clarification, please call me to discuss. Thank you. We look forward to hearing which <br />consultant is selected for this project. <br />Sincerely, <br />PACIFIC ADVANCED CIVIL ENGINEERING, INC. <br />Sonny O. Sim, P.E. <br />Vice President — Recreational Water <br />SOS/db <br />
The URL can be used to link to this page
Your browser does not support the video tag.