Laserfiche WebLink
March 31, 2008 <br />Mr. Kenny Nguyen <br />City of Santa Ana <br />20 Civic Center Plaza, MS M36 <br />P.O. Box 1988 <br />Santa Ana, CA 92702 <br />(714) 647-5360 <br />Re: City of Santa Ana Pool and Fountain Renovation Projects # 9076EP <br />Dear Mr. Nguyen: <br />This letter is in response to your request for clarification of our proposal related to <br />subconsultants. Our scope of work includes the following as it relates to each sub - <br />consultant: <br />Electrical Engineer Sub -Consultant — An electrical engineer will be required to size all <br />necessary electrical components for the redesign of the fountain. This includes single <br />line diagram, load calculations, panel schedule, and equipment wiring diagram. An <br />appropriate service entrance section and meter is already in place, so this is not <br />included in our scope. We anticipate that there will be changes to the fountain to require <br />this scope. This is for the fountain only and does not include the pool. For the pool <br />facility, we anticipate that our electrical engineer will inspect the facilities to be in <br />compliance with any code requirements. A report will be generated that indicate any <br />recommendations that we may have for the facility. Our scope of work will not include <br />any repairs or design based on the recommendations made by our sub consultant. <br />Structural Engineer Sub -Consultant — The structural sub -consultant is included in our <br />scope to review the existing facilities and make recommendations for any renovation that <br />may be necessary. We do not anticipate that there will be any major renovation to the <br />structural integrity of both the fountain and the pool based on our site visit. After our <br />structural subconsultant is done with their review, a report will be generated to document <br />their findings. This is the only scope included related to the structural sub -consultant. <br />Any findings that requires a redesign of the facility is not included in our proposal. <br />Hopefully this clarifies any questions you may have on the issue. If you require further <br />clarification, please call me to discuss. Thank you. We look forward to hearing which <br />consultant is selected for this project. <br />Sincerely, <br />PACIFIC ADVANCED CIVIL ENGINEERING, INC. <br />Sonny O. Sim, P.E. <br />Vice President — Recreational Water <br />SOS/db <br />