My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:43:18 PM
Creation date
5/8/2008 3:41:47 PM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE)
Contract #
A-2008-085
Agency
PUBLIC WORKS
Council Approval Date
5/5/2008
Insurance Exp Date
5/1/2011
Destruction Year
2022
Notes
Professional ins exp 04/30/2011; Auto exp 11/01/11 Amended by A-2009-010
Document Relationships
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) (2) - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 7, 2008 <br />Mr. Kenny Nguyen <br />City of Santa Ana <br />20 Civic Center Plaza, MS M36 <br />P.O. Box 1988 <br />Santa Ana, CA 92702 <br />(714) 647-5360 <br />Re: City of Santa Ana Pool and Fountain Renovation Projects # 9076EP <br />Dear Mr. Nguyen: <br />Per your request during our conversation today, please find our structural, electrical, and <br />mechanical sub consultant qualifications. For a typical pool and fountain project, PACE <br />provides all the management services as the prime consultant and the following design <br />services: <br />Structural <br />1. Retaining walls <br />2. Pool and fountain basins <br />3. Below grade cast in place pump stations <br />4. Above grade masonry or concrete buildings (single story) <br />5. Concrete fountain structures <br />Electrical <br />1. Controls and instrumentations <br />Mechanical <br />1. Hydraulic design including pump and pipeline sizing <br />2. Pump equipment room ventilation. <br />3. Pool heater sizing (does not include complicated heater ventilation). <br />4. Blower/compressor equipment sizing. <br />Our sub consultants are required on items that are outside of our experience and <br />capability. <br />Our sub consultants perform the following duties: <br />Structural (Wright Engineering, Irvine, CA) <br />1. Structural code assessments <br />2. Design of more complicated structures (retaining walls, pump stations, etc.) <br />3. Bridges <br />4. Timber structures <br />Electrical (Taylor Rymar Corporation, Phoenix, AZ) <br />1. Load calculations <br />2. Panel diagrams <br />3. Single line diagrams <br />4. Wiring diagrams <br />5. Electrical code assessments <br />
The URL can be used to link to this page
Your browser does not support the video tag.