My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COAST SURVEYING, INC. 1-2008
Clerk
>
Contracts / Agreements
>
C
>
COAST SURVEYING, INC. 1-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2013 11:35:42 AM
Creation date
5/8/2008 4:22:17 PM
Metadata
Fields
Template:
Contracts
Company Name
COAST SURVEYING, INC.
Contract #
A-2008-096
Agency
Public Works
Council Approval Date
4/7/2008
Expiration Date
4/1/2010
Insurance Exp Date
9/18/2011
Destruction Year
2014
Notes
Prof Liab exp 9/18/11 / W/C exp 9/18/11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pre-contractual expenses are defined as expenses incurred by the offeror in: (a) <br />preparing the proposal in response to this RFP; (b) submitting that proposal to <br />the City; (c) negotiating with the City in any matter related to this proposal; (d) <br />any other expenses incurred by offeror prior to date of award, if any, of the <br />contract. Offeror shall not include any such expenses as part of the price as <br />proposed in response to this RFP. <br />8] ADDENDA <br />Any subsequent changes to the RFP from the date of issuance to the date of <br />submittal will result in an addendum by the issuing office to those parties who <br />have provided the proper notice of interest in responding to the RFP. <br />91 PROPOSAL CONTENT AND SIGNATURE <br />Eight (8) copies of the proposal will be required with all copies having been <br />signed by the individual or, if a company, the company official with the power to <br />bind the company in its proposal. To be considered, all proposals shall be <br />completely responsive to the RFP. <br />10] COST AND PRICE <br />The offeror shall furnish a fee schedule for the proposed service. The offeror <br />shall also complete Attachment "A" (Cost Comparison Form) located at the end <br />of the Request for Proposal and include it with the fee schedule. <br />The fee schedule (3 copies) and Attachment "A" shall be contained in a sealed <br />envelope apart from the proposal, and submitted to the City. The fee schedule <br />shall include the following: <br />A. Hourly rate for each personnel category. <br />B. Any other direct charges, if not included in the hourly rate. <br />Total annual cost for the contract shall not exceed $240,000. <br />111 ACCEPTANCE OF CONTRACT <br />The contents of the proposal of the successful consultant shall become a <br />contractual obligation if a contract ensues. Failure of a Consultant to accept this <br />obligation will result in the cancellation of any award. Any damage accruing to <br />the City as a result of a failure to contract may be recovered from the consultant. <br />A sample agreement is attached for reference. <br />12 ] PRIME CONSULTANT RESPONSIBILITIES <br />The selected consultant will be required to assume responsibility for all services <br />offered in their proposals. The selected consultant will be the sole point of <br />5
The URL can be used to link to this page
Your browser does not support the video tag.