My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-031 - Approving Conditional Use Permit No. 2006-08
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2008
>
2008-031 - Approving Conditional Use Permit No. 2006-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:26:41 PM
Creation date
5/12/2008 4:09:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2008-031
Date
5/5/2008
Destruction Year
perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />0) All exterior conduit and electrical meters shall be installed and <br />screened in one metal enclosure painted to match the structure. <br /> <br />p) If a permanent generator is located on-site, it must meet all local <br />and regional requirements. <br /> <br />8. The permit applicant recognizes that the frequencies used by the cellular <br />facility located at 2210 North Grand Avenue are extremely close to the <br />frequencies used by the City of Santa Ana for Public Safety. This <br />proximity will require extraordinary "comprehensive advanced planning <br />and frequency coordination" engineering measures to prevent <br />interference, especially in the choice of frequencies and radio ancillary <br />hardware. This is encouraged in the "Best Practices Guide" published by <br />the Association of Public-Safety Communications Officials-International, <br />Incorporated (APCO), and as endorsed by the Federal Communications <br />Commission (FCC). Prior to the issuance of any permits to install the <br />facility, (permit applicant) shall meet in good faith to coordinate the use of <br />frequencies and equipment with the Communications Division of the <br />Orange County Sheriff-Coroner Department to minimize, to the greatest <br />extent possible, any interference with the Public Safety 800 MHz <br />Countywide Coordinated Communications System (CCCS). Similar <br />consideration shall be given to any other existing or proposed wireless <br />communications facility that may be located on the subject property. <br /> <br />9. At all times, the permit applicant shall not prevent the City of Santa Ana <br />from having adequate spectrum capacity on the City's 800 MHz radio <br />frequency. <br /> <br />10. Before activating its facility, the permit applicant will submit to a post- <br />installation test to confirm that "advanced planning and frequency <br />coordination" of the facility was successful in not interfering with the City of <br />Santa Ana Public Safety radio equipment. This test will be conducted by <br />the Communications Division of the Orange County Sheriff-Coroner <br />Department or a Division-approved contractor at the expense of the <br />applicant. This post-installation testing process shall be repeated for <br />every proposed frequency addition and/or change to confirm the intent of <br />the "frequency planning" process has been met. <br /> <br />11. The permit applicant shall provide a 24-hour phone number to which <br />interference problems may be reported. This condition will also apply to <br />all existing facilities in the City of Santa Ana. <br /> <br />12. The permit applicant will provide a "single point of contact" in its <br />Engineering and Maintenance Departments to insure continuity on all <br />interference issues. The name, telephone number, fax number and e-mail <br />address of that person shall be provided to the City's designated <br />representative upon activation of the facility. <br /> <br />Resolution No. 2008-031 <br />Page 7 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.