Laserfiche WebLink
<br />13. The permit applicant shall insure that lessee or other user(s) shall comply <br />with the terms and conditions of this permit, and shall be responsible for <br />the failure of any lessee or other users under the control of permit <br />applicant to comply. <br /> <br />14. The permit applicant shall provide a coverage and cell site location map <br />for each existing and proposed facility in Santa Ana. <br /> <br />15. The proposed wireless communication structure must be engineered to <br />allow the co-location of other service providers. <br /> <br />16. Locate all equipment and related appurtenances (appleton plug and <br />electric meter) on the inside of the equipment enclosure or inside the <br />building and underground all electrical power from the utility source shown <br />on the approved site plan. <br /> <br />17. Conditional Use Permit No. 2006-08 expires 10 years from the date of City <br />Council approval. <br /> <br />18. Sprint PCS and T-Mobile, the lessees for the wireless facility, agree to <br />remove any graffiti on the proposed equipment cabinets and wrought iron <br />perimeter fence. Graffiti removal must be done within 24 hours from <br />occurrence. <br /> <br />Resolution No. 2008-031 <br />Page 8 of 8 <br />