My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBCI, INC.
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
Q-R (INACTIVE)
>
RBCI, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:14:43 PM
Creation date
6/11/2008 3:46:02 PM
Metadata
Fields
Template:
Contracts
Company Name
RBCI, INC.
Contract #
N-2008-061
Agency
COMMUNITY DEVELOPMENT
Expiration Date
7/1/2008
Insurance Exp Date
11/2/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I Community Redevelopment Agency <br />20 Clvic Center Plaza, Santa Ana, Califomia 92702 <br />PROJECT SPECIFICATIONS <br />DATE: 12112107 <br />PREPARED BY: Ray Lirette (714) 667-2256 <br />PROJECT NAME: EI Faison (Mercado) <br />PROJECT ADRESS: 321 E. 4~ Street, Santa Ana, Califomia 92701 <br />OWNER: City of Santa Ana <br />City Contact - Gabriela Lomeli (714) 647-5479 <br />TENANT: Javier & Milena Marin, DBA EI Faison <br />GENERAL RE4UIREMENTS ~ <br />All work will comply with these General Requirements. The General Contractor is responsible for making <br />sure that their sub-contractors and laborers understand and comply with these General Requirements. <br />1. CONTRACTOR will perform all work in accordance with all applicable codes, laws, regulations and <br />requirements (federal, state and local). <br />2. CONTRACTOR will obtain all required permits and pay all related permit fees. <br />3. CONTRACTOR will furnish all labor, material, equipment, tools and supervision to complete the work / <br />project. <br />4. CONTRACTOR will protect all surrounding material, equipment and fumishings ftom damage during <br />construction. CONTRACTOR will (at their own time and expense) repair andlor replace any materials, <br />equipment and furnishings that they damage. <br />5. CONTRACTOR will execute the work in a manner chat will minimize its impact on the tenants and ensure <br />that essential utilities, fixtures and equipment are operative at the end of each day. <br />6. CONTRACTOR will remove and dispose of all constnrction related debris and maintain the job site in a <br />clean and safe condition at all times. <br />7. CONTRACTOR will conduct a physical inspection of the project site and verrfy all quantities, <br />measurements and dimensions. CONTRACTOR acknowledges, understands and agrees that they are <br />responsible for knowledge of all visible conditions that may affect the work. <br />EL FAISON -PROJECT SPECS <br />Page 1 of 3 <br />~VI_I'sr~a"'r ~' <br />
The URL can be used to link to this page
Your browser does not support the video tag.