Laserfiche WebLink
ITEM #1 • STEEL COLUMN <br />DESCRIPTION OF WORK: <br />Provide all labor and material to cut out and replace the damaged steel column located at the front of the <br />plaza. The size and composition of the new column shall match the existing column. <br />Contractor is responsible for bracing the existing structure and protecting it from damage. <br />Contractor is responsible for securing the work area and making sure that the public is protected. <br />COST OF ITEM: (~ 3~ ~~ <br />ITEM #2 -GLUE-LAM BEAMS I <br />DESCRIPTION OF WORK <br />Provide all labor and material to replace one deteriorated glue-lam beam spanning between the two front <br />kiosks. The size and composition of the new beam shall match the existing beam. <br />Provide all labor and material to replace the top 2 X 6 of four glue-lam beams, The composition of the <br />new material shall match the existing material. <br />Provide all labor and material to repair the dry-rot damage at six other locations. Repairs shall blend into <br />the surrounding material. <br />Contractor is responsible for bracing the existing structure and for protecting all surrounding structures <br />form damage. <br />• Contractor is responsible for securing the work area and making sure that the public is protected. <br />COST OF ITEM: ~ R "~ ~ ~ <br />~ ITEM #3 -EXTERIOR PAINT I <br />DESCRIPTION OF WORK: <br />Provide all labor and material to prepare and paint the exterior of the plaza. Item includes the metal roofs, <br />steel columns, wood beams, trellises and the exterior of the kiosks. Item excludes the roll-up doors and <br />window frames. <br />Remove and dispose of the shade cloth installed on the trellises. Remove and dispose of the roof <br />installed between the two front kiosks. <br />Prepare all surfaces to be painted. Remove all surface dirt and grime. Remove all loose and peeling <br />paint. <br />Contractor is responsible for protecting all surrounding structures, material, furnishings and equipment <br />from paint splatters and over-spray. <br />Apply a primer coat and an even and complete coverage of paint in accordance with the manufacturer's <br />recommendations. Drips, runs and voids will not be accepted. <br />Paint- Use high-quality paint by a reputable manufacturer. <br />a-o <br />COST OF ITEM: ~ u~U <br />EL FAISON -PROJECT SPECS <br />Page 2 of 3 <br />