Laserfiche WebLink
~ ITEM #4 -ROOF DRAINAGE i <br />DESCRIPTION OF WORK <br />Provide all material and labor tc install a new galvanized metal sleeve over the existing gutter located in <br />the center of each kiosk. <br />Contractor is responsible far protecting all surrounding material from damage. <br />Contractor will verify that all other drains and downs spouts are functioning properly. Additional work will <br />be handled by a written change order. <br />COST OF ITEM: <br /> <br />ITEM ff5 • MISCELLANEOUS ITEMS <br />DESCRIPTION OF WORK <br />Remove and dispose of the existing roof located between the two front kiosks and the shade material <br />installed on the wood trellises. <br />Remove and dispose of the light fixtures and wiring illegally installed by the tenants. The installation of <br />new fixtures will be handled by a wriien change order. <br />Contractor will protect all surrounding materials from damage. <br />COST OF ITEM: <br />TOTAL COST: <br />(Includes labor, material, overhead, supervision, permits and fees) <br />EL FAISON -PROJECT SPECS <br />Page 3 of 3 <br />