Laserfiche WebLink
Responses to <br />Environmental Checklist <br />For CEQA Compliance <br />• Prior to issuance of grading permits, the project developer shall submit and have approved a <br />surface drainage/utility plan that depicts all applicable Site Design, Structural Source Control and <br />Treatment Control Best Management Practices in accordance with the Orange County Drainage <br />Area Management Plan(DAMP) and the City of Santa Ana Local Implementation Plan (LIP). <br />• Provide an electronic copy of the "Water Quality Management Plan" (WOMP) that includes the <br />following: <br />a. Site Assessment <br />Site design Best Management Practices (BMP) <br />c. Applicable Routine Source Control BMP <br />d. Selection and sizing of the the Treatment Control BMP <br />e. Mechanism(s) by which funding for long-term operation and maintenance of all structural <br />BMP will be provided <br />f. Operation and Maintenance (O&M) Plan to describe the long-term operation and <br />maintenance requirements of all applicable structural BMP and to identify the entity in <br />charge of implementation. <br />g. WQMP shall be submitted in an electronic format, Adobe PDF, Mircosoft Word or other <br />electronic format (prior approval required). Two hand copies of the original signed owner <br />certification page must be submitted for the City's record <br />• The proposed project would be subject to City of Santa Ana Federal Clean Water Protection <br />Enterprise Fees. <br />B. Substantially deplete groundwater supplies or interfere substantially with groundwater <br />recharge such that there would be a net deficit in aquifer volume or a lowering of the local <br />groundwater table level. <br />No Impact <br />The proposed project would not interfere with ground water recharge because the project area is not <br />located in an area that is known to recharge the ground water system. Additionally, construction <br />operations for the proposed project would not encroach onto the underground water basin. <br />Implementation of the proposed project would not result in significant impacts to any underground water <br />supplies. <br />C. Substantially alter the existing drainage pattern of the site or area, including through the <br />alteration of the course of stream or river, or substantially increase the rate or amount of <br />surface runoff in a manner, which would result in flooding on or off-site? <br />D. Create or contribute runoff water which would exceed the capacity of existing or planned <br />storm water drainage systems or provide substantial additional sources of polluted run- <br />off? <br />3 ~~3~~ <br />