My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SAPPHOS ENVIRONMENTAL 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
S (INACTIVE)
>
SAPPHOS ENVIRONMENTAL 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:22:08 PM
Creation date
7/16/2008 5:22:05 PM
Metadata
Fields
Template:
Contracts
Company Name
SAPPHOS ENVIRONMENTAL
Contract #
A-2008-134
Agency
PLANNING & BUILDING
Council Approval Date
6/2/2008
Expiration Date
6/30/2009
Insurance Exp Date
6/20/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Significant Thresholds: qualitative and quantitative thresholds that will be used to assess the <br />significance level of the direct, indirect, and cumulative impacts of the proposed project <br />Impact Analysis: description of the processes, including use of computer simulation and models and <br />general plan consistency determinations that will be used to qualitatively and quantitatively <br />characterize the anticipated impacts of the proposed project <br />Mitigation Measures: the scope of feasible attributes that will be considered to reduce the impacts of <br />the proposed project to below the level of significance <br />The City will be provided with a Screen Check Draft EIR / EIS and will provide Sapphos Environmental, Inc. with a <br />composite set of comments on the EIR / EIS. Sapphos Environmental, Inc. will respond to the City's comments and <br />the City will have an opportunity to ensure that their comments have been adequately addressed during a galley <br />proof of the Draft EIR / EIS. Sapphos Environmental, Inc. will also prepare a notice of the Draft EIS to be filed with the <br />Environmental Protection Agency (EPA) and the Federal Register will be notified. <br />Work Products <br />• One (1) hard copy and one (1) electronic version in PDF of the Screen Check Draft EIR for review <br />and comment <br />• One (1) hard copy and one (1) electronic version in PDF of the Screen Check Draft EIS for review <br />and comment <br />• One (1) hard copy and one (1) electronic version in PDF of the final Draft EIR <br />• One (1) hard copy and one (1) electronic version in PDF of the final Draft EIS <br />TASK 4 RESPONSES TO COMMENTS <br />Work Efforts <br />This scope of services includes response to a maximum of fifty (50) substantive public or agency comments. <br />Coordination will be undertaken with City and Sapphos Environmental, Inc. staff in the preparation of responses to <br />the comments received on the Draft EIR / EIS. The format of the Final EIR /EIS will feature clarifications and revisions <br />to the Draft EIR / EIS developed as a result of the public review period and letters of comment organized by federal, <br />state, regional, and local agencies and organization, followed by individual and topical responses to the issues raised. <br />The Final EIR / EIS will include all correspondence with a double cross-reference system, whereby there is a response <br />to each comment submitted during the public review and comment period. The Final EIR / EIS shall include <br />clarifications and revisions to the Draft EIR / EIS resulting from response to comments. <br />Sapphos Environmental, Inc. will provide the City with a Screen Check Response to Comments for review and <br />comment. The City will provide Sapphos Environmental, Inc. with a composite set of comments on the Screen Check <br />Response to Comments. Sapphos Environmental, Inc. will respond to any City comments and prepare the Final <br />Response to Comments. The City will have the_ opportunity to verify that their comments have been adequately <br />addressed in a galley proof meeting. <br />Work Products <br />One (1) hard copy and one (1) electronic version in PDF of the Screen Check Response to <br />Comments for review and comment <br />One (1) hard copy and one (1) electronic version in PDF of the final Response to Comments <br />TASK 5 FINAL ENVIRONMENTAL IMPACT REPORT / ENVIRONMENTAL IMPACT STATEMENT <br />Work Efforts <br />At the close of the 45-day Draft EIR review period, Sapphos Environmental, Inc. will meet with the City to review <br />comments on the EIR. The Draft EIS will include a 30-day public review period during which time agencies and <br />interested parties can provide comments to the Lead Agency regarding the Draft EIS. <br />APRIL 1 1 , 2008 <br />$APPHOS ENVIRONMENTAL, INC. <br />M:\QUALS\2008\Q 147 1-003\SECTION 2\2A -SCOPE. DOC PAGE 2-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.