Laserfiche WebLink
10 1 CITY OF SANTA ANA- ENVIRONMENTAL SERVICES <br />Attend and/or organize a scoping meeting to get <br />comments on the project and scope of the EIR. <br />Time: 6 weeks <br />(This includes preparation of IS/NOP by EDAW,• review/ <br />comments by the City, and finalizing by EDAW. This does <br />not include the W -day public review period.) <br />3. Preparation of Screencheck Draft EIR <br />Prepare a complete screencheck Draft EIR for City staff <br />review, in accordance with the California Environmental <br />Quality Act (CEQA) of 1970 as amended, State Guidelines <br />for the Implementation of the California Environmental <br />Quality Act of 1970 as amended and City requirements. <br />The following are different sections of the EIR document: <br />• Executive Summary <br />• Introduction <br />• Project Description <br />• Description of Citywide and Regional Land Uses <br />Relating to the Project <br />• Environmental Setting, Impacts, Mitigation Measures, <br />and Levels of Significance <br />• Alternatives to the Proposed Project <br />• Other Mandatory CEQA Content (Significant <br />Irreversible Environmental Changes That Will <br />Be Involved In the Proposed Action Should It Be <br />Implemented; Growth Inducing Impacts of the <br />Proposed Action, Effects Found Not To Be Significant) <br />• Report Preparation Sources <br />• References <br />• Appendices <br />EDAW INC DESIGN' PLANNING ANC ENVIRONMENTS -WORLDWIDE <br />The environmental topics included in the EIR will be <br />addressed in the following manner: <br />• Introduction <br />• Existing Conditions <br />• Environmental Impacts <br />• Project Impacts <br />• Cumulative Impacts <br />• Mitigation Measures <br />• Unavoidable Significant Adverse Impacts <br />Time: 12 weeks <br />(This includes preparation of technical studies by <br />subconsultants, preparation of screencheck Draft EIR by <br />EDA Wand finalizing the screencheck Draft EIR by EDAW <br />per the City's comments. However, this timeline does not <br />include the City's review time.) <br />4. Preparation of Draft EIR for Public Review <br />Upon review of the screencheck Draft EIR by the City, <br />incorporate the requested revisions into the document and <br />submit back for a final review by the City. Provide copies <br />of the Draft EIR for distribution to the State Clearinghouse <br />and public in compliance with the mandated 45 -day public <br />review period. Complete the Notice of Completion (NOC) <br />form. <br />Time: 2 weeks <br />(This includes printing time for distribution of the Draft EIR <br />but does not include the 45 -day public review period. This <br />timeline assumes no extensive additional comments by the <br />City.) <br />