My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2008-08-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
08/18/2008
>
FULL PACKET_2008-08-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:28:49 PM
Creation date
8/13/2008 11:57:14 AM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
690
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order No. 1 <br />Project Nos. 06-9092 AND 08-9098 <br />August 18, 2008 <br />Page 2 <br />a. The handrails and guardrails at the Plaza of the Flags and the <br />Plaza of the Fountains have been vandalized over the years. The <br />original contract did not include replacement of guardrails and <br />handrails because the funding was not available at the time of <br />award. The funds are now available and staff recommends replacing <br />the handrails and guardrails. The contractor will replace <br />approximately 530 linear feet of handrail and guardrail at an <br />agreed unit price of $139 per linear foot. The contractor will be <br />paid according to the actual quantities of work. <br />ESTIMATED COST = $73,670 <br />b. The damaged access ramp at the northwest corner of the Plaza of <br />the Flags was not included in the contract, but needs to be <br />repaired. The work includes demolition, footing strengthening, <br />concrete replacement and joint caulking. at the lump sum price. <br />AGREED PRICE _ $6,258 <br />FISCAL IMPACT <br />The cost for the change order is estimated at $79,928. Funds are <br />available in the Civic Center Maintenance/Capital Projects Fund <br />(account no. 74-243-6631). <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />'-'-~ .~ ~~2'Z ~_~- ~~Z1~iul'ic~.l~.o~-~--~ <br />James G Ross ~~ Francisco Gutierrez ~° <br />Executive Director Executive Director <br />Public Works Agency Finance & Mgmt. Services Agency <br />Gera do Mouet <br />Exec tive Director <br />Park Recreation & Community <br />Services Agency <br />K:\Construction\RFCA-draft\06-9092 2008-08-18 COl.doc <br />23C-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.